My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 9:54:31 AM
Creation date
6/23/2020 1:57:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306046
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW NO. 1-2100 SERIES GRADE Lbs. max. (4" NPT) <br /> LEVEL SPILL CONTAINER <br /> INSTALLATION INSTRUCTIONS: Step 7: (See Figure 2) <br /> Apply pipe dope to nipple and install. Pipe dope to <br /> Step1. be a non-hardening, gasoline resistant pipe thread <br /> Per California SB-989, all metal must be protected seal compound. Use only factory made nipples. <br /> from direct contact with the elements. Coat stainless Nipples must be cut square and deburred. Torque <br /> steel band clamps with the following approved to 125 ft-lbs min. to 250 ft-lbs max. (4" NPT). <br /> coatings. OPW SL-1100, 3M Underseal 08883 or Torque value is based on rotation at the center of <br /> Polyguard Mastic CA-9. Only the threaded pipe. For standard cover models install adaptor and <br /> hardware needs to be coated in the field. dust cap. For sealable cover(1 SC) models, install a <br /> standard 4"pipe cap to support adjustment system. <br /> Step 2: (See Figure 1 &2) (Adaptor and dust cap must be installed in sealable <br /> Set riser pipe. "L" is the distance between the top of cover(SC) models after concrete has dried. <br /> the riser pipe and finish grade. Note: Nipple length is determined by measuring <br /> Note: The "L"dimensions below factors in a from the bottom of the threaded portion of the base <br /> 1"slope to grade. to the bottom of the cover. Then subtract 2"for <br /> clearance, height of adaptor and height of cap. <br /> Model Series "L" Dimension Range of nipple lengths that can be used in all of the <br /> 1-2100, 5 Gal. (Comp. Base) L=15 5/8" (40cm) OPW spill containers: 4" minimum to 14" <br /> 1-2100E, 7.5 Gal.(Comp. Base) L=19 5/8" (50cm) maximum. <br /> 1-2115, 15 Gal. (Comp. Base) L=19 5/8" (50cm) <br /> 1-2100C, 5 Gal.(Cast Iron Base) L=14 1/2" Finish Grade <br /> (37cm) <br /> 1-2100EC, 7.5 Gal.(Cast Iron Base) L=18 1/2" <br /> (47cm) <br /> 1-2115C, 15 Gal. (Cast Iron Base) L=18 1/2" <br /> (47cm) <br /> Note: <br /> If using OPW FSA-400, add 3-1/4"to Dimension "L". Fi urel <br /> If using OPW FSA-400-S, add 1-3/4 to Dimension <br /> 111 <br /> NOTE:FSA-400-S will only work with Cast Iron Finish Grade Slope 1"min. <br /> Base. <br /> . o <br /> Step 3: ° °'!ofRiser <br /> �3 <br /> Deburr and thoroughly clean riser pipe. Apply pipe ° °.o° ' RETE'°dope to riser threads. Pipe dope to be a non- o o I vE hardening, gasoline resistant pipe thread seal °• °compound. p °rStep 4:Install OPW FSA-400 Face Seal Adapter onto riser L <br /> using the OPW61SA-TOOL. Torque to 125 ft-lbs <br /> min. to 250 ft-lbs max.(4" NPT). Apply pipe dope to ofFSA-400. Pipe dope to be a non-hardening, in base <br /> gasoline resistant pipe thread seal compound. <br /> Step 5: iser Pipe <br /> Install spill container by rotating the mounting ring NMI <br /> until hand tight. <br /> NOTE:Do not attempt to completely tighten the <br /> container by using the mounting ring Riser Pipe <br /> Step 6: <br /> Finish tightening the spill container with the OPW <br /> 61 SA-TOOL. Torque to 125 ft-lbs min. to 250 ft. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.