My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012663
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1100
>
2900 - Site Mitigation Program
>
PR0507217
>
ARCHIVED REPORTS_XR0012663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 4:53:26 PM
Creation date
6/23/2020 2:20:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012663
RECORD_ID
PR0507217
PE
2950
FACILITY_ID
FA0007741
FACILITY_NAME
AUTO ZONE INC
STREET_NUMBER
1100
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
11733035
CURRENT_STATUS
02
SITE_LOCATION
1100 N WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�a <br /> Additional information obtained with different types of instruments(such as dissolved <br /> oxygen and turbidity meters)can also be collected if requested in advance. <br /> Personnel <br /> All Blaine Tech Services,Inc.personnel receive 29 CFR 1910.120(e)(2)training as soon <br /> after being hired as is practical. In addition,many of our personnel have additional cerdfi- <br /> cations that include specialized training in level B supplied air apparatus and the supervi- <br /> sion of employees worldng on hazardous materials sites. Employees are not sent to a site <br /> unless we are confident they can adhere to any site safety provisions in force at the site and <br /> t unless we know that they can follow the written provisions of an SSP and the verbal direr- <br /> tions of an SSO. <br /> In general,employees sent to a site to perform groundwater well sampling will assume an <br /> OSHA level D(wet)environment exists unless otherwise informed.The use of gloves and <br /> double glove protocols protects both our employees and the integrity of the samples being <br /> collected. Additional protective gear and procedures for higher OSHA levels of protection <br /> are available. <br /> 1 . <br /> i <br /> Decontamination <br /> All apparatus is brought to the site in clean and serviceable condition. The equipment is <br /> decontaminated after each use and before leaving the site. Decontamination procedures <br /> include complete disassembly of the device to a point where a jet of stearn cleaner water <br /> can be directed onto all the internal surfaces(this applies to the inside of the Teflon blad- <br /> ders <br /> ladders of USGS/N iddleburg pumps). Teflon conductor tubing is connected to the steam <br /> cleaner water outlet and water is run through the interior of the tubing for several minutes. <br /> The devices are then reassembled and actuated for a period of time as an additional meas- <br /> ure. Blaine Tech Services,Inc.frequently modifies apparatus to allow complete disassem- <br /> bly and proper cleaning. <br /> _ PIease call if we can be of any further assistance. <br /> ' ' hard C.Blaine <br /> — RCBrjmb <br /> BWwTech Sc i IncRepcmMo.914318-C•r US.Txh pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.