My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007874
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1100
>
2900 - Site Mitigation Program
>
PR0507217
>
ARCHIVED REPORTS_XR0007874
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:09:58 PM
Creation date
6/23/2020 2:52:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007874
RECORD_ID
PR0507217
PE
2950
FACILITY_ID
FA0007741
FACILITY_NAME
AUTO ZONE INC
STREET_NUMBER
1100
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
11733035
CURRENT_STATUS
02
SITE_LOCATION
1100 N WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Working To Restore Nature <br /> Addendum One to Remedial Action Plan March 1, 1993 <br /> Coca-Cola Former Distribution Facility, Stockton, California 5400601 <br /> sandy silts), and the proposed vacuum and flow rates (60-inches of water and 225 chn total <br /> flow). Enclosed in Appendix C is a summary of the manufacturer's description of the <br /> thermal oxidizer (USTEC, September 1991). The thermal oxidizer has already been <br /> purchased by Coca-Cola It has a peak flow of 600 cfin at a peak vacuum of 12-inches of <br /> mercury(163-inches of water), and a 40 horsepower regenerative blower. This is more than <br /> adequate to meet the proposed design conditions, and will allow additional capacity if an <br /> ' additional well(s) is added to the system at a future date. The thermal oxidizer will most <br /> likely be permitted for its full operating capacity of 600 cfm, in order to accommodate the <br /> addition of more vapor wells to the system if needed, and in order to increase the well flows <br /> ' in VEW-2, VEW-3, and VEW-7 as conditions allow. <br /> 1 1 <br /> Spill Prevention and Safety Plan <br /> I <br /> To reduce daily manpower needs for operations and maintenance of the system, and to <br /> prevent safety hazards or violations of permit conditions, a remote monitoring system and <br /> necessary instrumentation will be designed. The off-gas abatement device will be equipped <br /> with the following: a low and high temperature shutdown; a high petroleum hydrocarbon <br /> concentration shutdown; a flash back flame arrestor; a fuel high and low pressure system <br />` shutdown switch; a low pressure switch influent to the blower in the event of blower failure. <br /> A remote monitoring system will be installed to continuously monitor and periodically report <br /> the process variables that can influence the system's performance and cause an alarm or <br /> shutdown condition. The condensate storage tank will be contained within a double <br /> containment tank to prevent spillage of condensate. <br /> Pro'ected Gasoline Removal Rates <br /> ' The amount of TPHg in the subsurface soil in the vicinity of the former underground <br /> gasoline storage tank was previously estimated at about 9,560 pounds of TPHg (USTEC, <br /> September 1991). RESNA's estimate is less than this amount, but the more conservative, <br /> worst case USTEC value will be used for permitting in the event that this additional time <br /> may be needed. If the amount of TPHg is lower, then the clean up time will be <br />{ ' correspondingly shorter. <br /> With three vapor wells on line at an average of 75 cfm per well, the total flow rate will be <br /> 225 cfm. At startup, it is recommended that during approximately the first month of <br /> operation VEW-3 will be the only operating well, until some of the highest vapor <br /> concentrations beneath the tank pit are removed. This method of operation will contain <br /> petroleum hydrocarbon vapors beneath the tank pit, and reduce lateral and vertical <br /> migration of the vapors during vapor extraction. At an average startup TPHg concentration <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.