Laserfiche WebLink
1 <br /> AMR <br /> Working To Restore Nature <br /> Addendum One to Remedial Action Plan March 1, 1993 <br /> Coca-Cola Former Distnbutfon Facility, Stockton, California 54006.01 <br />' required by the regulators, and is generally renewed on an annual basis. Final compliance <br /> monitoring requirements will be stated in the approved Permit to Operate and proposed <br /> system momtoring procedures will be modified accordingly. Plate 8 summarizes this <br /> preliminary schedule of work. <br />' DISTRIBUTION <br /> It is recommended that copies of this report should be forwarded to the following regulatory <br /> agencies involved in this project: <br /> Mr. Michael Collins, Environmental. Health Specialist <br /> San Joaqum County Public Health Service <br /> Environmental Health Division <br /> P.O. Box 2009 <br /> Stockton, California 95201 <br /> Ms. Beth Thayer, Water Quality Engineer <br /> Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road <br /> Sacramento, California 95827-3098 <br /> 1 <br /> 1 <br />' 16 <br /> 1 <br />