My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1100
>
2900 - Site Mitigation Program
>
PR0507217
>
ARCHIVED REPORTS_XR0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:11:40 PM
Creation date
6/23/2020 3:02:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007882
RECORD_ID
PR0507217
PE
2950
FACILITY_ID
FA0007741
FACILITY_NAME
AUTO ZONE INC
STREET_NUMBER
1100
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
11733035
CURRENT_STATUS
02
SITE_LOCATION
1100 N WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AM <br /> Worsting To Restore Nature <br /> Notification of Vapor Extraction Test October 27, 1992 <br /> Coca-Cola Enterpnses-West, Stockton, California 54006.01 <br /> tObteemes <br /> "Ile ruin objectives of the test are: to collect operation data to evaluate the feasibility and <br /> efficiency of vapor extraction as a soil remediation alternative for the petroleum <br /> hydrocarbon impacted site soil; to determine the vapor flaw rates, petroleum hydrocarbon <br />' concentrations, system vacuums, etc in order to establish the design criteria for engineering <br /> design of a soil vapor extraction system; and to select the apparent best alternative for off- <br /> gas treatment. <br /> Vapor Test Equipment <br /> The one day test will be performed using a trailer-mounted internal combustion(IC) engine. <br /> The major components of the IC engin are: (1) A Ford industrial engine (sic cylinder, 300 <br /> cubic inch displacement engine, model number CS6-6491-6007-ZB) mounted on a 3/4 ton <br />' trailer. Four propane fuel cylinders, with a total capacity of 40 gallons are also attached to <br /> the trailer; (2) an instrument panel is incorporated into the engine housing, and a <br /> microprocessor-based control system' automancady controls the flow rates of dilution air. <br /> fue <br /> process air. and supplemental l; (3) a condensate removal system for removing trapped <br /> condensate in the vapor extracuon piping, and (4) a set of associated piping, control valves. <br /> and insm=entauon for veld measurements. <br /> DestructionEfficiene� <br /> coon eificiencv far total petroleum nvarocarbons as gasoline (TPHg) by this IC <br /> The destru - <br /> engine ranges from about 95010 to 99%. <br /> Site Safe r Plan <br />' A Site Safety Plan (RESNA, October 1992) has, been prepared for this site, and will be <br /> available to you at the job site, or a copy can be forwarded to you upon request. <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.