Laserfiche WebLink
S E C O R <br /> Ms. Devra Lewis <br /> April 15, 2004 <br /> Page 11 <br /> Report. Following the completion of fieldwork activities, SECOR will submit a report documenting <br /> the well installation and connection to the remediation system located at the Parcel 2A property. <br /> SCHEDULE <br /> Upon approval of the Work Plan from the RWQCB and DTSC, it is estimated that implementation of <br /> the Work Plan will require approximately six to nine months to obtain property access, permits, and to <br /> perform the field work. Schedules for DPE system start-up, pipeline abandonment, removal, and soil <br /> excavation, and SVE well installation are provided as Figures 4 through 6. <br /> If there are any questions, please call us at(916) 861-0400. <br /> Sincerely, <br /> SECOR International, Incorporated <br /> B�y� <br /> Thomas Y. Parker O <br /> Project Geologists t <br /> s No.C 058398 <br /> * F� 12/31/06 <br /> �9T Orv, 1 <br /> Rusty Beniosky, P.E. <br /> Senior Engineer <br /> Attachments: Figure 1 —Site Location Map <br /> Figure 2—Site Plan with Pipeline Excavation Details <br /> Figure 3-Site Map with Proposed Horizontal SVE Well Locations <br /> Figure 4—DPE System Start-Up Schedule <br /> Figure 5—Pipeline Abandonment, Removal, and Soil Excavation Schedule <br /> Figure 6—SVE Well Installation Schedule <br /> Stockton Parcel 2A:Work Plan for Pipeline Abandonment, Removal,and Soil Excavation and SVE Well Install <br />