Laserfiche WebLink
SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMENT PLAN Page 2 of 3 <br />0 41 <br />LOCATION OF HMMP FOR EMPLOYEE USE <br />(10) MAIN OFFICE ON TOP OF FRONT FILE CABINET <br />SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br />The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th mile of our facility. <br />Names of hospitals, schools, and day-care centers within 1/8th mile of our facility are also shown. This information <br />should be provided to the 9-1-1 operator at the time of the initial notification. <br />NORTH COMMERCIAL EAST COMMERCIAL <br />SOUTH COMMERCIAL WEST OPEN SPACE (RAILWAY) <br />SPILL CONTROL PROCEDURES SECTION <br />The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br />mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facility <br />are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br />notification. <br />SPILL CONTROL LEADER (12) KD GAMBLIN <br />(also oversees inspections of areas or <br />systems vulnerable to earthquakes) <br />HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br />BENCH MECHANICS <br />UTHORIZED SPILL CONTROL STRATEGIES (14) <br />This business has authorized the above personnel to perform the action(s) indicated below to control spills of <br />hazardous materials on its property. Persons performing these tasks will possess written procedures for performing <br />hem and will have received training on the procedures and equipment needed prior to carrying them out. Locations of <br />needed equipment are shown on the facility map. At a minimum our business must isolate the area of the spill and <br />make notifications. <br />SPILLS OF LIQUID MATERIALS <br />F Plug and Patch Container ❑ Build Retention Dike <br />❑ Remove Sources of Ignition F Position Container so as to Stop Leak <br />❑ Reduce Pressure in Container/System IF Isolate Area and Make Notifications <br />❑ Neutralize Spilled Material ❑ Secure System Valves and Closures <br />❑ Shutdown System Involved 0 Apply Absorbent Material to Spill Area <br />❑ N/A <br />RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br />Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br />Ventilate Area of Release ❑ Neutralize Spilled Materials <br />❑ Reduce Pressure in Container/System ❑ Position Container so as to Stop Leak <br />❑ Suppress Vapors with Water ❑ Place Spilled Material into Drum or Bag <br />Isolate Area and Make Notifications ❑ Isolate Area and Make Notifications <br />Remove Sources of Ignition N/A <br />❑ N/A <br />SPILLS OTHER <br />AUTHORIZED CLEANUP COMPANIES SECTION (15) <br />http://sjoesdata.orgloes h=p/section tableslhmmp_ps review.lasso?-Database=transacti... 9/17/2010 <br />