Laserfiche WebLink
section pursuant to Section 25404.1 shall require the owner or operator of the facilityoor <br /> the generator to complete and file a Phase I Environmental Assessment with the <br /> department or the authorized unified program agency not later than one year from the <br /> date of adoption of the checklist specified in subdivision (f),but not later than Jan 1,1997, <br /> or one year from the date that the facility or generator becomes authorized to operate, <br /> whichever date is later. <br /> --►Delta Plating did not complete and file a Phase I Environmental Assessment report. <br /> Neither,Delta Plating,or the DTSC are able to produce any evidence supporting a Phase <br /> I Environmental Assessment. A Phase I Environmental Assessment report is required <br /> within one year of receiving the facilities authorization to operate. <br /> V. ATTATCHMENTS. <br /> 1. Copy of Environmental Health Department Inspection Reports with <br /> photographs. <br /> 2. Copy of DTSC Inspection report with sample results. <br /> 3. Copy of tiered permitting notification form from 1995. <br /> 4. Copy of faxed cyanide order document. <br /> 5. Returned copy of completed financial assurance document. <br /> 6. Copy of signed return to compliance document <br /> 7. Copy of City of Stockton Fire Inspection report. <br /> 8. Copies of sanitary sewer water samples. <br /> 9. San Joaquin County Geographical Information System with 2002 photograph. <br /> 10. Copy of Files. <br /> John J Jackson,RENS Date: <br /> Registered Environmental Health Specialist <br />