Laserfiche WebLink
1 . 6 . The terms used in this Consent Agreement are as <br /> defined in Section 66260 . 10 of Title 22 of the California <br /> Code of Regulations (Cal . Code Regs . ) , except as otherwise <br /> provided. <br /> 1 . 7 . Respondent agrees to implement all approved <br /> workplans and to undertake all actions required by the <br /> terms and conditions of this Consent Agreement . <br /> 1 . 8 . Respondent waives any right to request a hearing <br /> on this Consent Agreement pursuant to HSC section 25187 . <br /> FINDINGS OF FACT <br /> 2 . 1 . On May 18 , 2004 Respondent submitted a Phase I <br /> Environmental Assessment- pursuant to HSC section 25200 . 14 <br /> Phase I) . The Phase I identifies three areas of concern <br /> main plating room, wastewater treatment area, and storm <br /> drain outside of the plating room) . <br /> 2 . 2 . Based on review of the Phase I Environmental Site <br /> Assessment report dated May 18, 2004, and site inspection <br /> conducted on May 20, 2004 , DISC concludes that further <br /> investigation is needed to determine, the nature and extent <br /> of contamination at the Main Plating room (AOC#1) , and the <br /> Wastewater treatment area (AOC#2) . <br /> 2 . 3 . The hazardous waste and hazardous waste <br /> constituents of concern at the Facility are Acids/Base with <br /> PH ranges < 2 . 0 & > 12 . 5, metals and Cyanide . <br /> 2 .4 . The hazardous wastes or hazardous waste <br /> constituents have migrated or may migrate from the Facility <br /> into the environment through the following pathways : soil, <br /> groundwater and surface water run-off . <br /> 2 . 5 . The Facility is located in an area of moderate <br /> industrial and commercial development with scattered <br /> residential homes . <br /> PROJECT COORDINATOR <br /> 3 . Within fourteen (14) days of the effective date of <br /> this Consent Agreement, DTSC and Respondent shall each <br /> designate a Project Coordinator and shall notify each other <br /> in writing of the Project Coordinator selected. Each <br /> Project Coordinator shall be responsible for overseeing the <br /> 2 <br />