My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1550
>
2231-2238 – Tiered Permitting Program
>
PR0507005
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:48 AM
Creation date
6/23/2020 6:36:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0507005
PE
2232
FACILITY_ID
FA0007213
FACILITY_NAME
PEARL CROP INC
STREET_NUMBER
1550
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206-3929
APN
177-290-05
CURRENT_STATUS
02
SITE_LOCATION
1550 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\TP\TP_2232_PR0507005_1550 INDUSTRIAL_FILE 2.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> STRUCTURAL SOLUTIONS GROUP <br /> July 18,2007 <br /> Ray Von Flue <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton,CA 95202-2708 <br /> Re:June 19 Hazardous Waste Inspection Report—Dana Reply <br /> Class II#10 <br /> See photo of absorbent material removed from along concrete. The material will be used again and disposed with current used <br /> absorbent material. <br /> Class II#12 <br /> See photo of repaired sink. The facility is working with a contractor to repair the etched concrete. <br /> Class II#20 <br /> See photo of proper label on 55 gallon drum of used oil. <br /> Notice to Comply#1  <br /> The 2006 SB-14 report for this facility is being prepared and will be submitted prior to the September 1 deadline. A copy will be <br /> sent to the Environmental Health Dept when completed. <br /> The 2 year SB-14 progress report has been added to a compliance calendar to be submitted in 2008 to the Environmental Health <br /> Dept. <br /> Notice to Comply#16 <br /> See photo of eyewash inspection tag. The inspections have resumed on the eyewash stations. <br /> The operators of the E-Coat system have been informed to remove any spilled paint paste from the spill control containment unit. <br /> The used oil in the spill containment unit on the South Mezzanine has been removed and placed in a 55 gallon drum with proper <br /> labeling. See photo of spill containment unit. <br /> Notice to Comply#19 <br /> Evergreen Oil has been contacted for pickup of the 55 gallon drum of used oil and the 55 gallon drum of used grease. The <br /> material will be removed from the facility on the week of July 16. <br /> Notice to Comply#21 <br /> The drum of used grease and drum of used oil filters have been properly closed. <br /> Notice to Comply#27 <br /> See copy of HW manifest#000931306 JJK <br /> Notice to Comply#45 <br /> See copy of updated emergency coordinator contact information—Contingency Plan <br /> Notice to Comply#48 <br /> Incident reports for the 1000 gallon paint spill and the dust collector fire have been sent to the Environmental Health Dept. See <br /> copies of reports. <br /> i <br /> STRUCTURAL SOLUTIONS GROUP USA STOCKTON FRAME PLANT DANA CORPORATION <br /> 1550 industrial Drive, Stockton, California 95206 Phone (209) 983-6100 Fax (209) 983-6122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.