My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1550
>
2231-2238 – Tiered Permitting Program
>
PR0507006
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 9:57:33 AM
Creation date
6/23/2020 6:36:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0507006
PE
2233
FACILITY_ID
FA0007213
FACILITY_NAME
PEARL CROP INC
STREET_NUMBER
1550
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206-3929
APN
177-290-05
CURRENT_STATUS
02
SITE_LOCATION
1550 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\TP\TP_2233_PR0507006_1550 INDUSTRIAL_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM Panasonic FAX SYS* PHONE NO. Mar. 09 1995 09:27PM P1 <br /> Facific Press Co. i. <br /> 2418 Cypress Way <br /> Fullerton, CA. 92631 <br /> 7141525-0630 <br /> Fav 7141525-2664 <br /> FAX TRANSMISSION COVER SUMT <br /> Date: March 9, 1995 <br /> Company Ease Corp. <br /> Name.- <br /> TO.- Mr. Tony A <br /> .F= 81.51455-1018 <br /> Sender.- Sum Duby <br /> Eh.-ar Tony: <br /> This is to notify you that the Pacific Press Filter press on your purchase order number <br /> 1P034903MC for Dana Corporation of Stockton Ca.complies with the following: <br /> All Pacific Press Co.filter presses are manufactured to our own internal specifications.This <br /> includes engineering,purchasing,welding,fabrication,paUlug,assembly and final inspection. <br /> Pacific Press Co.internal specifications are guidelines which include specific types of material, <br /> tolerances and finishes which am acceptable for our use.If the material does not meet our <br /> requirements they are rejected.Once the filter press is assembled it must pass a final quality <br /> assurance inspection for proper operation. <br /> If you require any additional information'please contact me. <br /> r <br /> ke <br /> Pacific Presso. <br /> Sr.Engineer <br /> MAR 9 195 22:17 PACE.001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.