Laserfiche WebLink
UPCF UST Operating Permit Application-Tank Information Instructions <br /> (Formerly SWRCB Permit Application Form B and UPCF Form hwfwre-b) <br /> Complete a separate Tank Information form for each UST for all new permits,permit changes,and any UST system information changes. This form must be submitted <br /> within 30 days of permit or UST system information changes, unless your local agency requires approval prior to making changes. For tanks that are part of a <br /> compartmentalized unit,each compartment is considered a separate tank and requires completion of a separate Tank Information form.For a UST closure or removal, <br /> complete only TYPE OF ACTION and Sections 1,II,III,IV,and IX.(Note: Numbering of these instructions matches the UPCF data element numbers on the form.) <br /> 430. TYPE OF ACTION-Check the appropriate box to indicate why this form is being submitted. <br /> 430a. DATE UST PERMANENTLY CLOSED-For reporting closure only:enter the date the UST was removed or closed on site. <br /> 430b. DATE EXISTING UST DISCOVERED-Epter the date this UST was discovered.Leave blank if installation date is known. <br /> 1. FACILITY ID NUMBER-This space is for agency use only. <br /> 3. BUSINESS NAME-Enter the complete facility name. <br /> 103. BUSINESS SITE ADDRESS-Enter the street address of the facility,including building number,if applicable. This address must be the physical location <br /> of the facility.Post office box numbers are not acceptable. <br /> 104. BUSINESS SITE CITY-Enter the city or unincorporated area in which the facility is located. <br /> 432. TANK ID#-Enter a unique number used to identify the tank. This number may be assigned by the UST owner/operator or the Unified Program Agency. <br /> 433. TANK MANUFACTURER-Enter the name of the company that manufactured the tank. <br /> 434. NUMBER OF TANK UNITS.Check the appropriate box to indicate if the tank is a stand-alone tank or one of two or more compartments in a tank system. <br /> A separate UST Operating Permit Application-Tank Information form must be submitted for each compartment. <br /> 435. DATE UST SYSTEM INSTALLED-Enter the date the local agency signed-off on installation of the UST system. This is the date of initial tank system <br /> installation,and does not include upgrades or retrofits which may have been performed later.If this is for a new installation,leave blank. <br /> 436. TANK CAPACITY IN GALLONS:Enter the tank capacity. For compartmentalized tanks,enter data for the compartment covered by this tank form only. <br /> 437. NUMBER OF TANK COMPARTMENTS:If the tank is a compartment,enter the total number of compartments in the UST. <br /> 439. TANK USE-Check the type of tank usage. <br /> 439a. If you checked"OTHER"specify the type of tank usage in the space provided. <br /> 440. TANK CONTENTS-Check the specific petroleum or non-petroleum substance stored. <br /> 440a. If you checked"OTHER PETROLEUM"specify the common name of the substance in the space provided[i.e.,the name used in the facility's Hazardous <br /> Materials Business Plan(HMBP)inventory). <br /> 440b. If you checked"OTHER"under Non-petroleum,specify the common name of substance in the space provided(i.e.,the name used in the HMBP inventory). <br /> 443. TYPE OF TANK-Check the box that identifies the type of tank. <br /> 444. TANK PRIMARY CONTAINMENT-Check the construction material of the primary containment(i.e.,inner tank wall nearest the hazardous substance <br /> stored). If the tank material is not listed,check"Other"and specify the material in the space provided. <br /> 444a. If you checked"OTHER"specify the type of primary containment in the space provided. <br /> 445. TANK SECONDARY CONTAINMENT-Check the construction material of the secondary containment that provides containment external to, and <br /> separate from,the primary containment described above.If the tank is a single-wall tank,check"None." If the material is not listed,check"OTHER"and <br /> specify the material in the space provided(e.g.,HDPE). <br /> 445a. If you checked"OTHER"specify the type of secondary containment in the space provided. <br /> 452 OVERFILL PREVENTION-Check the box(es)to describe the type(s)of overfill protection equipment installed. <br /> 458. PIPING SYSTEM TYPE-Check the type of product/waste piping installed in this tank system. "SAFE SUCTION"refers to piping systems meeting all <br /> requirements of 23 CCR§2636(a)(3)(also known as"European Suction"systems)(i.e.,sloped suction piping systems with no valves or pumps below <br /> grade and only one check valve,located below and as close as practical to the suction pump). Title 23,California Code of Regulations is available online <br /> at www.calregs.com. <br /> 464. PIPING PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)underground product/waste piping. <br /> 464a. If you checked"OTHER"specify the type of primary containment in the space provided. <br /> 464b. PIPING SECONDARY CONTAINMENT-Check the material(s)used to construct the secondary containment system(s)(i.e.,secondary piping,trench) <br /> provided for the product/waste piping.For single-wall piping systems,check"NONE." <br /> 464c. If you checked"OTHER"specify the type of secondary containment in the space provided. <br /> 464d. PIPING/TURBINE CONTAINMENT SUMP TYPE-Indicate the type of piping/turbine containment sump(s).Check"NONE"if not present. <br /> 464e-el. VENT PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)vent piping. (Note:Address venting of the tank <br /> primary containment only.) Specify OTHER type of containment in the space provided. <br /> 46417-171. VENT SECONDARY CONTAINMENT-Check the material(s)used to construct the secondary containment system(s)(e.g.,secondary piping,)provided <br /> for the vent piping.For single-wall piping systems,check"None." (Note:Address venting of the tank primary containment only.) Specify OTHER type <br /> of containment in the space provided. <br /> 464g-g1. VR PRIMARY CONTAINMENT-Check the material(s) used to construct the primary(i.e., inner)vapor recovery piping. For tanks without vapor <br /> recovery piping(e.g.,Diesel tanks),check"None." Specify OTHER type of containment in the space provided. <br /> 464h-hl. VR SECONDARY CONTAINMENT-Check the material(s)used to construct the secondary containment system(s)(e.g.,secondary piping)provided for <br /> the vapor recovery piping.For single-wall piping systems,check"None."Specify OTHER type of containment in the space provided. <br /> 4641. VENT PIPING TRANSITION SUMP TYPE-Indicate type of transition sump(s).Check"NONE"if not present. <br /> 464j-jl. RISER PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)piping for all risers(not drop tubes)other than <br /> annular space risers(i.e.,risers for filling or gauging of the primary tank). Specify OTHER type of containment in the space provided. <br /> 464k-k1. RISER SECONDARY CONTAINMENT-Check the material(s) used to construct secondary containment system(s) (i.e., secondary piping, sumps) <br /> provided for the riser piping.For risers without secondary containment,check"None."Specify OTHER type of containment in the space provided. <br /> 451 a-c. FILL COMPONENTS INSTALLED-Check the appropriate boxes to show that spill containment, tank bottom protection,and fill containment sumps(if <br /> applicable)are installed. <br /> 469a. UDC CONSTRUCTION TYPE-Check the box to describe the type of dispenser containment system(s)(i.e.,dispenser sumps or pans). If the system has <br /> no dispensers(e.g.,standby generator tank system),check"No Dispensers." If the system has a dispenser,but no UDC,check"NONE." <br /> 469b. UDC CONSTRUCTION MATERIAL-Check the box to describe the materials used to construct the UDC. <br /> 469c. If you checked"OTHER"specify the type of UDC construction material in the space provided. <br /> 448. STEEL COMPONENT PROTECTION-All systems contain some steel components. Check the appropriate box(es)to describe all corrosion protection <br /> methods used. "Isolation"means electrical isolation from soil,backfill,and groundwater. Examples include fiberglass cladding,non-metallic secondary <br /> containment systems which isolate steel components from the sub-surface environment,and insulating bushings. <br /> APPLICANT SIGNATURE-The same person who signs the UST Operating Permit Application-Facility Form shall sign in the space provided. This signature <br /> certifies that the signer believes that all information submitted is true and accurate,and that the UST system is compatible with the substance stored. <br /> 470. DATE-Enter the date the form was signed. <br /> 471. APPLICANT NAME-Print or type the name of the person signing the form. <br /> 472. APPLICANT TITLE-Enter the title of the person signing the form. <br /> UPCF UST-B Rev.(12/2007)-2/2 www.unidoes.org <br />