My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2494
>
2300 - Underground Storage Tank Program
>
PR0231104
>
COMPLIANCE INFO_2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 2:08:21 PM
Creation date
6/23/2020 6:37:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2009
RECORD_ID
PR0231104
PE
2351
FACILITY_ID
FA0003863
FACILITY_NAME
SOHAL #3
STREET_NUMBER
2494
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15328008
CURRENT_STATUS
01
SITE_LOCATION
2494 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\2494\PR0231104\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN — PAGE 2 <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING NIETHOD(S)(Check all that apply) <br /> I,CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: V1WP4Ejt— R6Q-r tisr. MODEL <br /> LEAK SENSOR MANUFACTURER: n-T, MODEL#(S):_ MM <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? F4 a, YES Cj b.NO M" <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? 9 a.YES [] b.NO <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? 9 tt.YESEl b,NO <br /> 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: R.ass. MODEL 4(S): rasa <br /> _________ <br /> [3 3.-VISUAL MONITORING DONE: a,DAILY ❑ b.WEEKLY(Reqjues agency approval} <br /> 4,NO DISPENSERS <br /> 0 99.OTHER(Specify) M61, <br /> 1,WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES C014TROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN,PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONT14S AS REQUIRED <br /> _REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) moo, <br /> 1, @ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. 0 OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01/2005) <br /> 4, CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6, Q STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> T Q SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGETANKS" <br /> 99. OTHER(Specify): PLi l4 1IJ t)t';'P, Mal <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documcras relevant to theirjob duties and can access those documents when needed, <br /> By January 1,2005 this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(]CC). By <br /> January 1,2005,and annually thereafter.the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best mana3ement-practices. <br /> A The facility employee's role with regard to the leak detection equipment. <br /> > The facility employee's role with regard to spills and overfills, <br /> > Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> —7 <br /> Please vise thistion to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency) <br /> Ti mpm�&hf C&I low res <br /> cx+ <br /> AS OF 111/05, THE"DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMff APPi KATION 7 <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§271 <br /> CERTIFICATION:I certify that the information provided herein is true and;ccurate to the best of my Icrto`vledge. <br /> OWNER/OPERATOR SIGNATURE REMEZN_EMK DATE: <br /> Eff owner M40 <br /> El Operator —1113 <br /> OWNER/OPERATOR NAME(print): OWN13110PERATOR TITLE: <br /> ft Nb 0 W M <br /> fe- ne VO rn I W C%Ltt:;L <br /> (Agency Use Only) This plan has been reviewed and: Approved Approved With Conditions 0 Disapproved <br /> Local Agency Signature: Date: _.____y.Conditions: <br /> SJCEH"(07M21)-3/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.