Laserfiche WebLink
Monitoring System Certification-Page 2 of 3 <br /> Site Address: 13975 E. Hwy 88 Date of Testing/Servicing: 8128/18 <br /> D. Results of Testing/Servicing <br /> Software Version Installed• 331.01 <br /> Complete the following checklist: <br /> ® Yes 1 ❑ No* Is the audible alarm operational? <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> • Yes ❑ No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ® Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g.modem) <br /> ❑ N/A operational? <br /> N Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) ® Sump/Trench Sensors; ® Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? tib Yes ❑ No <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> N N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? 0 % <br /> ❑ Yes* ® No Was any monitoring equipment replaced?If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* Im No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product;❑ Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set-y2 reports, i a licable. <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Vent Sump Sensor(857080-111) & (794380-304) -Tested & Passed. <br /> All Sumps & UDC's are monitored by additional Brine Sensors (797380-304) -Tested & Passed. <br /> 91 & Diesel are Split Tanks and Share Annular. <br /> Estop-Tested & Passed. <br />