Laserfiche WebLink
Adkk A" <br /> IED PROGRAM CONSOLIDATED FOIV <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - Pae 1 of 2 <br /> TYPE OF ACTION ® 1.NEW PLAN [:12.CHANGE OF INFORMATION agog. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 <br /> BUSINESS NAME(Same as Facility Name or DBA) 3 <br /> Tesoro/Shell 68150 <br /> BUSINESS SITE ADDRESS 103 CITY 104 <br /> 13975 E. Hwy 88 Lockeford <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE` <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> Py the equipment manufacturers'instructions,or annual,whichever is more frequent.Such work must be performed by qualified personnel.[23 CCR§2632,2634,2638,2641] <br /> a90-3a. <br /> MONITORING EQUIPMENT IS SERVICED E 1.ANNUALLY El ( ]) 1r ecif l 99.OTHER S ): 490-36. <br /> III. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 490-4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) that� o 111 <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Gilbarco 490-7. MODEL#: EMC 490-8. <br /> 490-9. 490-10. <br /> LEAK SENSOR MANUFACTURER: Veeder Root MODEL#(s): 794380-301 <br /> _..................._......._. _ <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§2643] ago-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS eci f� 490-18. <br /> .:...... g.p.h. g.p.h. ( P ]): 490-10- <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] ago-zo. <br /> -'-'---......---....-----..........._.._._..._...__............................_..-'---......_...._.........-.........._..........._.- --- -'-.._.._. _...__......._....__.................._.__..._._....--'--....--'--...__....----- '---..._.................................... <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG [23 CCR§2646 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> ] 490-22 <br /> ❑ 490 23 <br /> 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS eci ago-z4. <br /> ( p �) ....... .........490-25:............. <br /> ..-.__........._...---'-"- _......................_.__.-.. ...._ 490-26. <br /> ❑ 99.OTHER(Specify): 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hatak 111 <br /> ® I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [23 CCR SECONDARY CONTAINMENT IS: [:1 a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED E d.UNDER VACUUM 490-29. <br /> §2636] <br /> PANEL MANUFACTURER:Gilbarco 490-30. MODEL#: EMC 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 857080-111 - 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. E a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a.YES ❑ b.NO 490-35. <br /> _........_.__......._-......--'---'-' <br /> ....--.........---............................_.__._......---.....---.._-............. -- - ......_...__............-...................._.......................--..._.. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§26361 <br /> 490-37. 490-3.8. <br /> MLLD MANUFACTURER(S): MODEL#(S): <br /> _ ...__......__....... .._......_.......... ..-.....-.-- 490-39. <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] ago-39. <br /> ELLD MANUFACTURER(S):Veeder Root 49040. MODEL#(S): Series 8484 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a.YES ❑ b.NO 490-44. <br /> ....... ...........__._.........._..............---.............--'- ''-'-...._...._.. ' '--._......--._.._-..._....' -..........._.........................__........---..........-................__......-'----....-------...-..---._...._....._......................._....._..............._......._..........._........ <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS eci ago-46. <br /> --................-"-- - ----.-._...-...............---........-...........................-_._............._..... ...-_..._._..._..- -''-...-�' p-- �..... ago-a7,__ <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49. <br /> *Allowed for monitoring of unburied•emergencp generator fuel�iping,o per HSC_§25281 SibZ(3)_ -- <br /> ........_...._.__.....__�-._. ...._......_...._.-..__...................---...._.........---.-...._.--__.._._-.....--'--� <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)] ago-so. <br /> -..._...__....._-............_...__..._.............--...._...............-----'--'-'-- -........... ......---.............._......................_-._......__.._._..---- �.._-'--............ -.__......---....... <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> - -.............................._............--" ---- -...__....._....-' -"-- -......_............._......_.....__........_.......................__...._.............._._.................-...-_...._....-----............---- <br /> 4wi <br /> ❑ 99.OTHER(Specify) 490-53. <br /> UPCF UST-D(12/2007)-1/5 www.unidocs.org <br />