Laserfiche WebLink
1 -16-1996 3 : 32PM FROM RHL PETALUMA 7656835 P,3 <br />19. Piping (cross-sectionat diagram, including connections to tank and dispensers). <br />(A) Vent and tank riser primary containment system equipped With overfill prevention system that: <br />® Restricts delivery of flow to tank [Section 2635 (b) (2) (8) or (C)), or <br />Provide positive shut off of flow to the tank at no more than 95 X (Section 2635 (b)(2)(01, or <br />(B) Vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)) <br />Sloped so contents of the pipe wilt drain back into the storage tank if the suction is <br />® released. <br />No valves or pumps instalted below grade. <br />Inspection method provided to demonstrare compliance with section 2636 (a) (3). <br />t0) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) Underrggr'n�cu+d'primary piping wilt meet att of the following requirements <br />er Primary piping in contact with hazardous substance under normal open 'on conditions shatt be: <br />installed inside a secondary containment system in the form of: secondary pipe Vautt or <br />Lined trench to be sloped to a collection Sump at the low point of the piping. <br />_1'1� Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards_- <br />Lined trench used as secondary containment <br />�® Material compatibte with the substance stored. <br />®� Covered and capable of supporting any expected vehicular traffic. <br />(F) Underground pi In 4th secondary containment wilt be equipped and monitored as follows_ <br />secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />If Automatic time teak detectors will be installed on pressurized piping <br />Manufacturer:11-29m, j , Model- <br />Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />q Annual tine tichtness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />/� faits or is disconnected. <br />20. V /State Water Resources Control Board "Facility (A)" and "'sank Permit (B)" application forms submitted. <br />21. V Ptan review and operating permit fees paid. r� <br />22. What is the approximate depth to ground water: <br />(include source of information - barehote togs, monitoring well data, water <br />studiesetc ) <br />® <br />_u,Ew-'r. ME. MI" CAW&AA11� ) S -3o57. S�F:IfiC� `gra DaTA <br />23. ✓/ Total number of tanks on site after installation; rJ futSnggty Yb l") <br />24. ✓/ County/City Fire District and 8uitding Department notified. <br />25. J In the event contamination is crosserved, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workplan to PIiS-END Site Mitigation Unit prior to initiating any <br />assessment or remediation activities_ For further assistance contact the Site Mitigation Unit at (209) 469.3450. <br />The owner or operatc?.F musr acknowledge this responsibility for workplan submittal by signature and date below. <br />flame / Titte_iiQF�!? Date /0A 19A <br />CONDITIONS OF APPROVAL: <br />