My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 4:23:07 PM
Creation date
6/23/2020 6:38:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231952_2905 W BENJAMIN HOLT_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br /> Visible Leak Actions <br /> Stsp Action Res onsible Pa Where/When <br /> 1 Inspect and document all sumps Contractor On Going <br /> including: <br /> « Identify all system <br /> components <br /> • Bottom Drain <br /> • Penetration Boots filled <br /> « Gel Coating <br /> • Presence of brine in sump <br /> • Brine level in reservoir <br /> • Demarcation of brine level <br /> • Brine replenishment volume <br /> • All sump components for <br /> leaks <br /> 2 Complete a Sump Inspection Contractor On Going <br /> Log report(see Exhibit 3) <br /> documenting all sumps <br /> 3 Perform sump integrity tests on Contractor On Going <br /> all sumps and complete a Sump <br /> Testing log Ee2ort Exhibit 3 <br /> 4 Obtain all required repair Contractor Begin-next Business <br /> permits Day after San Joaquin <br /> EHD approval of Work <br /> Plan <br /> 5 Repair all visible leaks Contractor Begin within 1 week of <br /> including: San Joaquin EHD <br /> • Entry boot clamps permit approval <br /> « Entry boots <br /> • Brine reservoirs <br /> • Tubing <br /> « Tubing fittings <br /> • Sump test ports <br /> • <br /> $um walls <br /> 6 Monitor all brine levels at Contractor Begin-Project <br /> monthly intervals including: Commencement <br /> • Brine level in reservoir End—90 days after <br /> • Demarcation of brine level successful repair <br /> Brine replenishment volume <br /> « Visually check all sump <br /> com onents for leaks <br />
The URL can be used to link to this page
Your browser does not support the video tag.