Table 2 <br /> Non-Visible Leak Actions <br /> Step Action Res onsible Party Where/When <br /> 1 Implement troubleshooting Contractor Begin-Within 1 week <br /> techniques including: after San Joaquin EHD <br /> • Bravo Vacuum Testing permit approval <br /> procedure(see Exhibit 1 <br /> section C) <br /> • Bravo field air integrity test <br /> see Exhibit 1 section A <br /> 2 Complete a Sump Testing Log Contractor Upon completion of <br /> report(see Exhibit 3) for each inspection,repair and <br /> sum testin <br /> 3 Update permits as needed Contractor Before commencement <br /> of the applicable work <br /> 4 Implement repair procedures Contractor Begin-Within I week <br /> including: after San Joaquin EHD <br /> • Boot filling permit approval <br /> • Sump wall repair <br /> • Boot cleaning and refill <br /> 5 Monitor all brine levels at Contractor Begin-Project <br /> monthly intervals including: Commencement <br /> • Brine level in reservoir End—90 days after <br /> • Demarcation of brine level successful repair <br /> • Brine replenishment volume <br /> • Visually check all sump <br /> components for leaks <br />