My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 4:23:07 PM
Creation date
6/23/2020 6:38:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231952_2905 W BENJAMIN HOLT_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br /> Non-Visible Leak Actions <br /> Step Action Res onsible Party Where/When <br /> 1 Implement troubleshooting Contractor Begin-Within 1 week <br /> techniques including: after San Joaquin EHD <br /> • Bravo Vacuum Testing permit approval <br /> procedure(see Exhibit 1 <br /> section C) <br /> • Bravo field air integrity test <br /> see Exhibit 1 section A <br /> 2 Complete a Sump Testing Log Contractor Upon completion of <br /> report(see Exhibit 3) for each inspection,repair and <br /> sum testin <br /> 3 Update permits as needed Contractor Before commencement <br /> of the applicable work <br /> 4 Implement repair procedures Contractor Begin-Within I week <br /> including: after San Joaquin EHD <br /> • Boot filling permit approval <br /> • Sump wall repair <br /> • Boot cleaning and refill <br /> 5 Monitor all brine levels at Contractor Begin-Project <br /> monthly intervals including: Commencement <br /> • Brine level in reservoir End—90 days after <br /> • Demarcation of brine level successful repair <br /> • Brine replenishment volume <br /> • Visually check all sump <br /> components for leaks <br />
The URL can be used to link to this page
Your browser does not support the video tag.