My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 4:23:07 PM
Creation date
6/23/2020 6:38:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231952_2905 W BENJAMIN HOLT_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 5 DAN two'/"holes at the 12 o'clock position in the housing flange. <br /> These sMuld be positioned 318"off the outer edge of the stiffening <br /> ribs.One hole is for filling,one hole is for venting. <br /> STEP 6 Reinstall the interior flex boot and loosely tighten the band clamps <br /> to hold the boot in position.Pull the boot back just enough at the <br /> top to expose the fill and vent holes and re-snug the clamps. Fill <br /> the entire boot cavity with Blue Fill 4036 until the filler begins to <br /> run out of the vent hole.There should be no visible air bubbles in <br /> the boot. Once the boot is full, carefully loosen the large clamp <br /> and push the top of the boot to the fully seated position and re- <br /> tighten all the clamps. <br /> STEP 7 Clean up any excess material quickly as it sets up rapidly and <br /> allow 24 hours for the Blue Fill 4036 to fully set before testing. <br /> BLUELINE • Drive,Yubo Citv, CA 95991 - Phj866)267-9765 Fax:[866]310-3848 <br />
The URL can be used to link to this page
Your browser does not support the video tag.