My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 4:23:07 PM
Creation date
6/23/2020 6:38:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231952_2905 W BENJAMIN HOLT_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification-.Page 2 or 3 <br /> Site Address:_ 2905 W.Benjamin Holt Dr Date of Testing/Servicing: 7128/10 <br /> D. Results of Testing/Servicing <br /> Software Version Installed- 3Z-7,13,p <br /> Complete the foliowin checklist: <br /> FaNes <br /> ❑ No* Is the audible alarm operational? <br /> ❑ No* is the visual alarm operational? <br /> ❑ No* Were all sensors visually inspected,functionally tested,and confirmed o. rational? <br /> ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> W Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g.modem) <br /> ❑ NA operational? <br /> ❑ Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> 0 N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that applti) ❑ Sumpfrrench Sensors: ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑ Yes ❑ No <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tonk overfill warning device(i.e. no <br /> ® N,A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank ctl•oacity does the alarm trigger? % <br /> ❑ Yes* IL No Was any monitoring equipment replaced?If yes, identify specific sensors, probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in,Section E,below. <br /> ❑ Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that applw <br /> ❑ Product;❑ Water. If yes,describe causes in Section E,below. <br /> ❑ Yes 1 ❑ No* I Was monitoring system set-up reviewed to ensure eroEr settin= ? (Attach set-up re orfs, i a licable. <br /> ❑ Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> w In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: i s 1 s -97y fA U ^%a 52.An�'f'r G+'twi.P(L>n1_ f-C <br /> L�7 A 6-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.