My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 3:15:22 PM
Creation date
6/23/2020 6:39:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0535432_2680 REYNOLDS RANCH_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BCE#14573 <br /> NIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK "Do" EV 'Ell <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. DEC 14 ZU1U 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S). <br /> I FACILITY INFORMATION ONM<r AL, <br /> FACILITY ID#(Agency Use Only) -jPE"M11ySEPV1qES t <br /> BUSINESS NAME(Same as FACILITY NAME) COSTCO GASOLINE FACILITY #1091 3. <br /> BUSINESS SITE ADDRESS 322 E. HARNEY LANE 103. CITY LODI 104. <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 42632,2634 2638 2641 <br /> MONITORING E UIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHERS eci 490-30- <br /> Q ( p fy)� 490-3b <br /> III.MONITORING LOCATIONS <br /> ®1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV:TANK MONITORING IS PERFORMED USING THE FOLLOWING METHODS) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> _ PANEL MANUFACTURER: VEEDER-ROOT _ _ 490-7. MODEL#: TLS-3508 490-8 <br /> LEAK SENSOR MANUFACTURER: VEEDER-ROOT T 4919 MODEL#(S): 794380-301 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: _ 490-14. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS -�� ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS eci Ovals <br /> g•P• g•P• (Specify): avare <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> 4.WEEKLY MANUAL TANK GAUGING MTG 23 CCR 2645. TESTING PERIOD: ❑ 36 HOURS ❑ b.60 HOURS 490-21 <br /> ❑ ( )( § ) a• ago-zz <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY El c.OTHER(Specify): 4990-z5 <br /> ❑ <br /> 99.OTHER (Specify): 490-26 <br /> ago-n <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ®1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28- <br /> VISUAL ALARMS. (23 CCR§2636) Piping Sump Piping <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ®d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER: VEEDER-ROOT 490-30 1 MODEL#: TLS-350R 490-31 <br /> LEAK SENSOR MANUFACTURER: VEEDER-ROOT a9a3z MODEL#(S): 857080-112 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 490-36 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLDMANUFACTURER(S) VEEDER-ROOT 490-40. MODEL#(S): 848480-001 490-41 <br /> PROGRAMMED IN LINE LEAK TEST: ® 1.MINIMUM MONTHLY 0.2 g.p.h. ® 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. El a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 490-45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-4649047 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> *Allowed for monitoring of unburied emergency enerator fuel piping only er HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> El 99.OTHER(Specify) ago-sz <br /> 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.