My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 3:15:22 PM
Creation date
6/23/2020 6:39:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0535432_2680 REYNOLDS RANCH_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order: 2281427 <br /> R <br /> I. Results of Vacau are Menitodug Equipment Testing <br /> This page should be used to document testing and servicing of vacuum and pressure interstitial sensors. A copy of <br /> this form must be included with the Monitoring System Certification Foran, which must be provided to the tank <br /> system owner/operator.The owner/operator must submit a copy of the Monitoring System Cer�fication Form to the <br /> local agency regulating UST systems within 30 days of test date. <br /> Manufacturer: V Model: system Type:❑Pressm'eO Vacuum <br /> sensor ID i <br /> Components)Monitored by this Sensor: _j <br /> S - Sensor Functionality Test Result Pass; ❑ Fail Interstitial Communication Test Result:❑Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Y <br /> -5-10 Sensor F unctionak Test Result ass; ❑ Fail Interstitial Communication Test Result:❑Pass; ❑ Fail <br /> Components)Monitored by tbis Sensor: 'j. <br /> Sensor Functionality Test Result ass; ❑ Fail Interstitial Communication Test Result:❑Pass; ❑ Fail <br /> 5-12 Component(s)Monitored by this Sensor. <br /> S" Sensor Functionality Test ResultPlass; ❑ Fail Interstitial Communication Test Result:❑Pass; ❑ Fail <br /> Component(s)Monitored by this Seng. <br /> 5 ' )3 Sensor Functionality Test Result: Pass; ❑ Fail interstitialldommunication Test Result:❑Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor. <br /> Sensor Functionality Test Result: Pass; ❑ Fail Interstitial Communication Test Result:❑Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result ; ❑ Fail Interstitial Communication Test Result:❑Pass; ❑ Fail f <br /> p Componertt(s)Monitored by Sensor: �>,,-AA <br /> s' (j Sensor Functionality Test Result: ass; ❑ Fail Interstitial Communication Test Result:❑Pass; ❑ Fail <br /> Component(s)Monitored by this Seng: <br /> Sensor Functionality Test Result:❑Pass; ❑ Fail Interstitial Communication Test Result:❑Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result:❑Pass; ❑ Fail Interstitial Communication Test Result:❑Pass; ❑ Fail <br /> J Comments: <br /> i <br /> Pageof i <br /> 1 <br /> Tanknology Inc. 11000N.MoPac Expressway,Suite 500,Austin,Texas 78759 <br />
The URL can be used to link to this page
Your browser does not support the video tag.