Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> r MW*n <br /> TEST DATE:05/26/11 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER2281425 <br /> CLIENT:COSTCO WHOLESALE AUSTIN,TEXAS 78759(512)451-6334 SITE:COSTCO LODI <br /> Tank ID: 87-B 2 Tank manifolded: NO Bottom to top fill in inches: 179.o <br /> Product: REG UNLEAD Vent manifolded: YES Bottom to grade in inches: 199.o <br /> Capacity in gallons: 29,816 Vapor recovery manifolded: YES Fill pipe length in inches: 60.0 <br /> Diameter in inches: 119.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 629 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW FISERG Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> Provides product for disp 3/4,7/8,11/12,15/16 <br /> Start(in) End(in) <br /> Dipped Water Level: 0.00 0.00 New/passed Failed/replaced New/passed Failed/replaced <br /> Dipped Product Level: 96.00 96.00 L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Probe Water Level: 0.071 0.071 Make: <br /> Ingress Detected: Water N Bubble N UllageN Model: <br /> Test time: 12:49-14:20 S/N: <br /> Inclinometer reading: 0.00 Open time in sec: <br /> Holding psi: <br /> VBCuTeCt Test Type: Multiple tanks Resiliency cc: NOT NOT <br /> VacuTect Probe Entry Point: Fill Test leak rate ml/m: TESTED TESTED <br /> Pressure Set Point: 2.16 Metering psi: <br /> Tank water level in inches: 0.00 Calib.leak in gph: <br /> Water table depth in inches: 204.00 Results: <br /> Determined by(method): MONTR WELL <br /> Result: PASS <br /> COMMENTS <br /> COMMENTS <br /> Wet Annular DW/FRP tanks. Vent and Vapor lines <br /> tested with this test. <br /> MEMO= EM <br /> Material: DW FIBERG <br /> Diameter(in): 2.0 <br /> Length(ft): 175.0 <br /> Test psi: 5o <br /> Bleedback cc: 104 <br /> Test time(min): 30 NOT NOT NOT <br /> Start time: 11:17 TESTED TESTED TESTED <br /> End time: 11:47 <br /> Final gph: 0.000 <br /> Result: PASS <br /> Pump type: PRESSURE <br /> Pump make: FE PETRO <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 06/02/201107:48 <br />