Laserfiche WebLink
-- ----- -- - --------- -------- <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK i <br /> MONITORING PLAN-(Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT'(UDC),MONITORING <br /> thalGheck all <br /> t a l <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-542. <br /> © 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b. <br /> LEAK MONITOR MANUFACTURER: 490.55. MODEL#: 490-56. <br /> LEAK SENSOR MANUFACTURER: 49057. MODEL#(S): 490-59. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490.59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. _ __.... ___ _- ❑a.YES__ ❑.b.NO 49060 <br /> - - <br /> FAMURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-61, <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑ b.NO d90-62. <br /> UDC CONSTRUCTION IS: ❑ I.SINGLE WALL ❑ 2.DOUBLE WALL 490-63. <br /> i <br /> IFDOUBLE WALL; 490-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490=64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION LD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.[23 cctc 12644.11 <br /> ❑ 2.SECONDARY CONTARZVIENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.66' <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. ago 67, <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> ® a ALARM LOGS ❑u b:VISUAL-INSPECTION RECORDS --EI c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ®-h E ANf R ANT)CALTBRATIONRF[ORDS <br /> IX. TRAINING <br /> IN Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILrIy(Check all that apply) <br /> ®THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-696• <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-691 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-691 <br /> STATISTICAL INVENTORY RECONCII.IATION" <br /> g. <br /> ❑ <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69k OTHER(Specify): 490-69s. <br /> 490691. <br /> ® This facility has a`Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The 'Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COADIENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71. <br /> Audible and visual overfill alarm set at 90 of tank capacity for overfill protection. See additional attachment. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owncr/Operator is responsible for ensuring that:1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2. all conditions that indicate a possible release are investigated,and 3. all monitoring records are maintained properly. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Dennis Bock 4 '72 TITLE: Environmental Compliance Manager 3 490-73. <br /> NAME: Tlm Hurlocker 490.74- TITLE: Director of Gasoline Operations , 490.75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the ownerloperato,and inform the ovwcropotator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the inforipation providgd herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE.- - 490.77. <br /> 1/7 <br /> REPRESENTING:❑1.Tank O..WO rata❑2.F.6tity Owner/ tar IN 3.Authorized Repramtefive of Owner 490-76. <br /> 490-78 APPLICANT TITLE: ';°:. 490-79. <br /> APPLICANT NAME(print): <br /> David H Rogers Director of Real Estate Develoomet t <br /> UPCF UST-D(12/2007)-3/4 www.unidocs.org <br />