Laserfiche WebLink
® UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> a MONITORING PLAN--(Page I of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> Check one item only) 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( TAN KS 1, 2,3 <br /> I. FACILITY:INFORMATION. . <br /> FACILITY ID#(Agency Use Only) - - I I I I I I ;.i <br /> BUSINESS NAME(Same as FACILITY NAME) COSTCO GASOLINE (LOC. NO. 1091) 3. <br /> BUSINESS SITE ADDRESS 2680 REYNOLDS RANCH PARKWAY 103. CITY LODI 104. <br /> II.::EQUIPMgNT TESTING AND.Pi2EVENTNE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR2632?2634263. 8a2641� <br /> EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER490-3b <br /> MONITORING E <br /> Q (Specify): 440.3b <br /> III..MQN QRING LO.CAT14N$ <br /> ELNEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o-4 <br /> qg� �7��i�A,� 7�� T p�7�rl�•�Thi L� T!� 7��E�1 Et �..,T... �+j �.�1i T[��7[)�i�T�+ 1�r ICS ri [ <br /> t:C1.1�6iT.t!i®t7la®Av1,R 4.T At7 J4RL,'4BRE�1[�1}iJ it\G 1I1 i:i VA.iiJ.U9.F 9'Y Altt.,s METJ[A®J,/EO) ..'.. <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT 49M <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY M b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 49" <br /> - PANEL MANUFACTURER: Veeder-Root 490-7. MODEL#:TLS-35OR 490-8 <br /> LEAK SENSOR MANUFACTURER:Veeder-Root 490-9' MODEL AS):794380-301 W 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490.11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 49043 <br /> IN-TANK PROBE MANUFACTURER- 490-14. MODEL#(S): - 4901 s <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS I] b.DAILY/NIGHTLY ❑ c.WEEKLY 490.16 <br /> _..- --.... AW.R... .... ... <br /> __._...._._._❑.d:...MONTHLY...... ❑-e OTHERS eif):.... <br /> PROGRAMMED TESTS: ❑ a.0.1 h.� _ ❑ b.0.2 h. ❑ c.OTHER490-18 <br /> $•p• g•P• (Specify): 09019 <br /> ❑ 3.MONTHLY STATISTICAL]INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: E] a.36 HOURS [Ib.60 HOURS y�22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQ UENCY: ❑ a.ANNUALLY [Ib. c.BIENNIALLY ❑ OTHER( p �)� 490-2S(Specify): 490-25 <br /> 5 <br /> ❑ <br /> 99.OTHER (Specify): 490-26 <br /> 490-27 <br /> Y..PIPE M®NITORING:IS PERFORMED..USING TIIE FOIL®WING 1VIMETIIQD(S)_(ChCck.all that aPpIY} <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:❑a.DRY Eb.LIQUID FILLED ❑c.PRESSURIZED Ed.UNDER VACU_U_M490.29 <br /> PANEL MANUFACTURER: Ve2der-RODS 490-30 t MODEL#:TLS-_35OR 431 <br /> LEAK SENSOR MANUFACTURER:Veeder-Root 490 32 MODEL#(S): 794380-208,794384-304 M 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. N a.YES ❑b.NO -T 49034 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 0 a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR§263@ 490-36 <br /> MLLD MANUFACTURER(S): PE Petro 49037 MODEL#(S): STP-MLD-D 490-38 <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> _ ELLD MANUFACTURER(S)Veeder-Root 490.40. MODEL#(S): -480-- 1 490.41 <br /> PROGRAMMED IN LINE LEAK TEST: 0 1.MINIMUM MONTHLY 0.2 g.p.h. 2.MINIMUM ANNUAL 0.1 g.p.h. 490 0-2 <br /> FLLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490.43 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 49044 <br /> 4.PIPE INTEGRITY TESTING 49o-4s <br /> TEST FRE UENCY0 a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490.47 <br /> 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> *Mowed for monftoamg of unburied em ency genamtor fuel piping only per HSC 125281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRI'T'ERIA 123 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-5t <br /> El99.OTHER(Specify) 490.52 <br /> 49Q-53 <br /> UPCF UST-D(12/2007)114 14573-F-ADPL-TANK PERM...Revised-2012.09-20.pdf <br />