My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 4:04:53 PM
Creation date
6/23/2020 6:39:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0535432_2680 REYNOLDS RANCH_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> UNIFIED PROGRAM CONSOLIDATED FORM BCE #14573 <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Pae 1 of 2 <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION 490 1. <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL UST's AT THIS FACILITY. 490-2. <br /> (Check one item only) 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): Tank#4-LUBRIZOL <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) i•'' <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Costco Gasoline(Loc.No. 1091) <br /> BUSINESS SITE ADDRESS 103• CITY 104. <br /> 2680 REYNOLDS RANCH PARKWAY LODI <br /> H. E NT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the ScEipment manufacturers'instructions,or annually,whichever is more Pnuent.Such work must be performed by qualified personnel.[23 CCR§2632,2634,2638,26411 <br /> MONITORING EQUIPMENT IS SERVICED (Specify): 490.3b. <br /> 1.ANNUALLY ❑ 99.OTHER S eci 0-90.32. <br /> MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] <br /> 490-4. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHODS) ta�kall <br /> ❑� 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑Q b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49"_ <br /> PANEL MANUFACTURER: Veeder-Root 490-7. MODEL#: TLS-350R 49". <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-9, MODEL#(S): 794380-303 490-M <br /> - <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 0-90'1. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490.14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17. <br /> PROGRAMMED TESTS: ❑ a.0.I . .h. ❑ b.0.2 . .h. ❑ c.OTHER( ify): 490�y 1s' <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.11 490-20. <br /> 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490--al. <br /> ❑ S.TANK INTEGRITY TESTING PER[23 ccR§2643.11 490-23. <br /> TEST FREQUENCY: 0 a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS i 490 20-. <br /> 490.26. <br /> 99.OTHER(S i ): 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING NIS T OI1(S) th(Check Xlf <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. ago zs. <br /> [23 CCR <br /> SECONDARY CONTAINMENT IS: a.DRY b.LIQUID FILLED ❑ c.PRESSURIZED d.UNDER VACUUM 490-'- <br /> PANEL MANUFACTURER: Veeder-Root 490.30. MODEL#: TLS-350R 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490.32. MODEL#(S): 323, ,857280-100 49111- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490'34- <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. N a.YES ❑ K NO 490.35. <br /> Q 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.123 CCR026361 <br /> MLLD MANUFACTURER(S): FE Petro 490.37. MODEL#(S): MLD-D 490-38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 496'39• <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490.42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43- <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490.44. <br /> ❑ 4.PIPE INTEGRITY TESTING. <br /> a9oas. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(S i ) 4 . <br /> 5.VISUAL PIPE MONITORING. 490-4& <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY do EACH TIME SYSTEM OPERATED- 490-49- <br /> *Allowed for monitoring o€unburied erator fimel pimHSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 ccR§2636(a113)] 490-50- <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> 490.52. <br /> 99.OTHER(Specify) 490.53. <br /> UPCF UST-D(1212007)-114 www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.