My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 4:04:53 PM
Creation date
6/23/2020 6:39:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0535432_2680 REYNOLDS RANCH_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ma r. 27. 2013 8:33AM No, 6553 P. 8 <br /> UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br /> UST Monitoring Site Plan <br /> Site Address:Costco #1091 2680 Reynolds Ranch,Lodi,CA 96240 <br /> LECTEM <br /> D=Dispenser <br /> P=Monitoring Conlrol panel <br /> r , S=Sensor <br /> STP=Tumine Sump <br /> Fe Fal BuCket <br /> V=Vapor su" <br /> A-Annular$anger <br /> s <br /> M=Automatic Tank Gage <br /> L=Line teak Detector <br /> i Product Lines= <br /> Vent Lines= <br /> ' vapor Lines= <br /> CASm Cteen Alf Seperarr"--- <br /> La Vent=Vent <br /> �� Overfill Alar and Ach Swiich <br /> Emergency Shut ON Switch <br /> I <br /> , <br /> trxa�ls 87AI�.=7VlDNNS�rq(/ti„p <br /> LeakDefotm <br /> t <br /> VACamisms/32117401 <br /> r64seoa2a <br /> 79490440da9 <br /> ! aleTP•iis6t■a <br /> 764380-301 Ann <br /> Addktva prat463e1E01 <br /> FE-Petro Will <br /> PI.J."91066.1 <br /> PLL043311711 <br /> PLLO.91318998 <br /> uAll proMs 646390.110 <br /> a <br /> Al 6f4 <br /> •° 241 X iia l-17 <br /> o-la�xe sela„4 yew <br /> �.....................------ ----------------- --- <br /> _ -- „r 1.500 G811onAddltive <br /> ~ tla <br /> LA <br /> 4N Ad&$W* <br /> F F m <br /> + 111 <br /> 1.95419 <br /> Date map was drawn:3/7/2013 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Cortiftoation. <br /> On your site plan,show the general layout of tanks and piping.Clearly identify tocationsof the following equipment,if installed:monitoring system <br /> control panels;sensors monitoring tank annular spaces,surnps,dispenser pans,spill containers,or other secondary containment areas:mechanical or <br /> electronic line leak detectors;and in tank liquid level probes(if used for leak detection).in the space provided,note the date this Site Plan was <br /> prepared. <br /> Page 5 Of_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.