My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 4:04:53 PM
Creation date
6/23/2020 6:39:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0535432_2680 REYNOLDS RANCH_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(C)• TANKS 1, 2, 3 <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) COSTCO GASOLINE (LOC. NO. 1091) 3.. <br /> BUSINESS SITE ADDRESS 2680 REYNOLDS RANCH PARKWAY 103. CITY LODI 104. <br /> IL EQUIPMENT TESTING AND PREVENTIVE N CE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634 2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER S u 491-3 <br /> ( �fY)• 490-3bb <br /> M.MON1TOR1NG WCATIONS <br /> I.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634 %4 <br /> IV.TANK MONffOWNG IS PERFORMED USING THE FOLLOWINGMETHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: Veeder-Root " I MODEL#: TLS-350R 4 <br /> LEAK SENSOR MANUFACTURER:Veeder-Root 49"" 1 MODEL#(S):794380-301 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WAU TAMM.(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12' MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-f4' MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> d.MONTHLY e.OTHERS i 490-17 <br /> 490-18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: [:1a.36 HOURS E] b.60 HOURS 490-21 <br /> 490-22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> 490-25 <br /> 99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MON1TORING IS PERFORMED USING THE FOLLOWING OD(S)(Cheek still that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-29 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:❑a.DRY ®b.LIQUID FILLED ❑c.PRESSURIZED Ed.UNDER VACUUM 490.29 <br /> PANEL MANUFACTURER: Veeder-Root a9ta3oMODEL#: TLS-350R 490.31 <br /> LEAK SENSOR MANUFACTURER:Veeder-Root 490 3z MODEL#(S): 7 Q-2(>S,794380-304 490.33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 490-34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2 490-36 <br /> MLLD MANUFACTURER S): EE Petro 490.37 MODEL#(S): STP-MLD-D 490-38 <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTUREMS)Veeder-Root 4�40" MODEL#(S): 49041 <br /> PROGRAMMED IN LINE LEAK TEST: 0 1.MINIMUM MONTHLY 0.2 g.p.h. 2.MINIMUM ANNUAL 0.1 g.p.h. 490.42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490-43 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-44 <br /> 4.PIPE INTEGRITY TESTING 490.49 <br /> TEST FREQUENCY ❑ a.ANNUALLY b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-464 47 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> °Allowed for monito'ng of unburied emergency enerator fuel pipiM only per HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ <br /> 99.OTHER(Specify) 490-52 <br /> 490-53 <br /> UPCF UST-D(12/2007)1/4 14573-F-APPL-TANK PERM...Revised-2012-09-20.pdf <br />
The URL can be used to link to this page
Your browser does not support the video tag.