My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_1987-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 12:59:37 PM
Creation date
6/23/2020 6:40:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2000
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_1987-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Evacuation Procedures <br />(1) In the event that the hazardous waste or materials incident threatens employees or other occupants of a DSS Compam job <br />site. the EC in command shall order an immediate evacuation. <br />(2) The EC or designee will announce the evacuation via the public address/paging system or other communication system. <br />(Describe): <br />(3) Employees, upon hearing the order to evacuate, or Nvlto other-Mse become aware of the need to evacuate. shall notifi⢠other <br />employees, safely cease operations and evacuate without delay via the nearest designated unobstructed exit. An evacuation <br />plan (see Section 8 below) is posted in all work areas showing the nearest exit(s) and the location of the assembly area in <br />front of the building. <br />(4) Regardless of the exit used, all employees wlto evacuate shall assemble at <br />The EC or designee shall be present in this location to account for all personnel Mown to be on the site. No employee shall <br />leave the site without specific authorization by the senior supenisor, EC or designee. <br />(5) Employees shall not re-enter the job site for any purpose until specifically authorized to by the EC or designee. <br />8. Evacuation Routes <br />If evacuation is required, the following routes must be taken. If anv evacuation route is blocked by the hazard. the secondM, <br />routes shall be taken: <br />Location of Employee/Evacuee <br />Evacuation Route <br />Secondary Route <br />As required by Cal/OSHA Standard. 8 CCR § 3220, evacuation routes are diagramed and posted in various locations at the <br />facility. <br />9. Approval and Adoption <br />Contingency Plan Approved by: <br />Tide: <br />S ignature/Date: <br />Effective Date: <br />Note: This Contingency Plan will be reviewed annually and revised as necessary. Recipients will be provided a revised copy if <br />significant changes are made. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.