My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_1987-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 12:59:37 PM
Creation date
6/23/2020 6:40:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2000
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_1987-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date of Inspection '��uG-� Inspector , /)o' fir' �• <br />• F <br />MONITORING ALTERNATIVE ,#7 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the liqui(: level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />Annual precision test on tank and piping. <br />Tank gauging performed as follows: <br />-� Tank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />L-° Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />(% over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />�'1�, Precision test(s) must be performed by ���^� and results submitted to this <br />office within 30 days of the test. <br />j2 Tank gauging must be started immediately. (See instructions above). <br />I the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />DOARD OF TRUSTEES <br />SAN JOAQUIN LOCAL HEALTH DISTRICT <br />SERVING <br />James Culbertson, Pres. <br />City of Lodi <br />Patricia E. Vannuccl, Secy. <br />1601 East Hazelton Avenue, P. O. Box 2009 <br />San Joaquin County <br />Anthonette Van Spronsen <br />City of Escalo <br />Earl Plmentel <br />Stockton, Californla 95201 <br />City of Manteca <br />Fern Bupbee <br />209/466-6781 <br />City of Ripon <br />Daniel L. Flores <br />City of Stockton <br />John O. Most, M.O. <br />City of Tracy <br />William J. Wade <br />Jopl Khanna, M.O.. M.P.H.. District Health Officer <br />San Joaquin County <br />Mary Anna Love <br />San Joaquin County <br />Fac i 1 i ty Name <br />i< <br />Address;:/, <br />Date of Inspection '��uG-� Inspector , /)o' fir' �• <br />• F <br />MONITORING ALTERNATIVE ,#7 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the liqui(: level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />Annual precision test on tank and piping. <br />Tank gauging performed as follows: <br />-� Tank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />L-° Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />(% over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />�'1�, Precision test(s) must be performed by ���^� and results submitted to this <br />office within 30 days of the test. <br />j2 Tank gauging must be started immediately. (See instructions above). <br />I the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.