My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:10:00 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 RE(;wvEL) <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X *See comments below <br /> Test Method Developed By: ❑Spill Bucket Manufacturer is Industry Standard ❑P W;Ko, <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> *Spill/Overfill Boxes Tested annually with Monitoring System Certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.