Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name: KNIFE RIVER CONTRACTORS I Date of Testing: 7/11/13 <br /> Facility Address: 655 W. CLAY ST. STOCKTON, CA 95206 <br /> Facility Contact: Phone: <br /> Date Local Agency Was Notified of Testing:6/19/13 <br /> Name of Local Agency Inspector(fpresent during testing): ELENA <br /> 2.TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 4162 d Street Galt,CA 95632 (209)744-0112 Fax:(209)744-0116 <br /> Technician Conducting Test: ❑Lyle D.Nimmo ® Zane A.Nimmo ❑ David A. Winkler ❑ Felix G.Ramirez <br /> 5249115-UT 5263322-UT 5263373-UT 5273934-UT <br /> Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: Z Hydrostatic ❑Vacuum ❑ Other <br /> Test Equipment Used: TAPE MEASURE, H2O Equipment Resolution: 1/16" <br /> ,.:.. : <br /> Identify Spill Bucket(By Tank 1 87 2 3 4 DIESEL <br /> Number, Stored Product, etc.) <br /> Bucket Installation Type: <br /> ® Direct Bury ❑ Direct Bury ❑ Direct Bury ®Direct Bury <br /> El Contained in Sump ❑ F1 Contained in El Contained inContained in Sump Sump Sum <br /> Bucket Diameter: 11 11 <br /> Bucket Depth: 13 1/2 14 <br /> Wait time between applying <br /> vacuum/water and start of test: -- <br /> Test Start Time(Ti): 0950 0950 <br /> Initial Reading(Rj): 12 1/2 13- <br /> Test End Time(TF): 1050 1050 <br /> Final Reading(RF): 12 1/2 13- <br /> Test Duration(TF—Tj): HR HR <br /> Change in Reading(RF-Rj): 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Z Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ® Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature `-- Date: 7-11-13 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />