My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:10:00 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQ_dMVOUNTY ENVIRI.),NMENTAL HEALTIN&PARTMENT <br /> UNDERGROUND STORAGE TANK o <br /> MONITORING PLAN- PAGE 1 <br /> M01. <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION JUN <br /> M02. <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FAINFO <br /> CILITY 12111 IO".N IT/ ` ; <br /> FACILITY ID#(Agency Use Only) <br /> M03. <br /> FACILITY NAME D.S.S. C M04 M05. <br /> FACILITY SITE ADDRESS 655 West Clay St. CITY Stockton <br /> II. 'EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors probes,line leak detectors,etc.)be performed in Mob <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. Mol. <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> . .: III. MONITORING:LOGATIONS ,; :. <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MIO. <br /> ONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) ntl 1 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M13 <br /> M12. MODEL#: ILS - "3000 <br /> PANEL MANUFACTURER: Veeder - Root M15. <br /> M14. MODEL#(S): 794'390 - 408 <br /> LEAK SENSOR MANUFACTURER: IPerTer - Rnnt - <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TA MK(Sl MIT <br /> PANEL MANUFACTURER: MODEL#: <br /> M18 MODEL#(S): M19. <br /> IN-TANK PROBE MANUFACTURER: M2o <br /> LEAK TEST FREQUENCY: Ela.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY <br /> OTHER(Specify): M21. <br /> [Ie. <br /> d.MONTHLY ❑ ( P fY)� <br /> M22. M23.PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. 11c.OTHER(Specify): <br /> AA24. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 M25 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 M26 M27 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) M28 <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> ONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT M31 <br /> SECONDARY CONTAINMENT IS: Ela.DRY El b.LIQUID FILLED ❑ c.UNDER PRESSURE El d.UNDER VACUUM M33. <br /> M32. MODEL#: TTS *3nnr <br /> PANEL MANUFACTURER: V edPr - Root Mas <br /> Mia. MODEL 794190 - 209 <br /> LEAK SENSOR MANUFACTURER: Veed�Root - M36. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? [R a.YES ❑ b.NO <br /> M37. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? fR a.YES [:] b.NO <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED M38 MODEL#(S): X00, T.T17000 M39. <br /> MLLD MANUFACTURER(s): VMT <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> Mao. MODEL#: Mat. <br /> ELLD MANUFACTURER: M42. <br /> PROGRAMMED LINE INTEGRITY TESTS: Ela.MINIMUM MONTHLY 0.2 g.p.h. [I b.MINIMUM ANNUAL 0.1 g.p.h. <br /> M43. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? C] a.YES [:1b.NO <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> Maa. <br /> ❑ 4.INTEGRITY TESTING Mas. Mab. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> 5.VISUAL MONITORING DONE: ® a.DAILY .Requires ab.gencyapproval •+Allowed KLY* ❑for vwn oc. �nng ofOunburied emNTHLY ergenry generEACH IMator fuel piping oE SYSTEM OnlypeHSC§D25281.5(bX3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) Mag <br /> ❑ <br /> 99.OTHER(Specify) <br /> 07/23/03 <br /> SJCEHD-d(07/03)-1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.