Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1_ FACIT.ITV TNFORMATTON <br />Facility Name: KNIFE RIVER DSS I Date of Testing: JULY l 7,2009 <br />Facility Address: 655 WEST CLAY AVE STOCKTON CALIFORNIA <br />Facility Contact: JOHN Phone: 209-948-0302 <br />Date Local Agency Was Notified of Testing :07-01-09 <br />Name of Local Agency Inspector (f present during testing): SJVAP NORTH <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 4162 "d Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ❑ Zane A. Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />Credentials: ® ICC Service Tech. ® SWRCB Tank Tester <br />3_ SPTT,T. RIT( KFT TESTING INFORMATION <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: TAPE H2O <br />Equipment Resolution: 1/16 <br />M254-_,MMMMM�.... <br />nz.,T <br />3 <br />4 <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />1 87 <br />2 DIE <br />Bucket Installation Type: <br />® Direct Bury <br />❑ Contained in Sump <br />® Direct Bury <br />❑ Contained in Sump <br />❑ Direct Bury <br />❑ Contained in <br />Sump <br />❑ Direct Bury <br />❑ Contained in <br />Sum <br />Bucket Diameter: <br />I 1 <br />I 1 <br />Bucket Depth: <br />14 <br />14 <br />Wait time between applying <br />vacuum water and start of test: <br />Test Start Time (Tj): <br />1000 <br />1000 <br />Initial Reading (Rj): <br />13 <br />13 <br />Test End Time (TF): <br />1100 <br />1100 <br />Final Reading (RF): <br />13 <br />13 <br />Test Duration (TF — Ti): <br />1 HOUR <br />1 HOUR <br />Change in Reading (RF - Rj): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />0 <br />0 <br />Test Result: <br />M Pass ❑ Fail <br />[0 <br />Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ _Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature Date: <br />State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />