Laserfiche WebLink
SWRCB, January 2002 <br />9. SPELL/OVERFILL CONT <br />Facility is Not E ui d With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: ❑ Spill ` ket Manufacturer <br />E Other (,Spec) <br />Test Method Used: O Pressure <br />C Other (Specify) <br />Test Equipment Used: <br />0 Page —7 of r <br />BOXES <br />C Industry Standard C Professional Engineer-.,.- <br />0 <br />ngineer- -❑ Vacuum ❑ Hvdrostatie' <br />ution: <br />Split Bob # Spill Box # <br />-' Spill Box # <br />Spill Box # <br />Bucket Diameter: <br />Bucket Depth: r, <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: r <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF) ~` <br />j <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result:. ❑ Pass '=.� ❑ Fail`i•, ❑Pass "❑ Fail <br />11 Pass � ❑Fail � <br />❑Pass"� ❑Fail <br />gents — (include information on repairs madeprior to testing, and recommended ollow-u for ailed tests) <br />/ efiJj y <br />(P., e`EA`,el ^.-#�_ dt`,.` l p'A✓p -� ?q �° tF ?:w K..s€j v a f <br />w <br />