Laserfiche WebLink
SWRCB, January 2002 <br />6. PILING Sl IMP TF QTLN[Z <br />Page 9 of —1 <br />Test Method Developed By: <br />U Sump Manufacturer U Industry Standard ofessional Engineer <br />U Other (Spec& <br />Test Method Used. <br />U Pressure <br />U Vacuum <br />ydrostatsc , <br />LJ Other (Specifv) <br />TestEqu mentUN& :7-,��,Lr e -a 4v- <br />EquiptnentResplu ion:.00S" <br />Sump# ,L <br />Sump # Z— <br />amp # Sump # <br />Sump Diameter: <br />l{ to <br />4211 <br />Sump Material: <br />Frlu <br />Height from Tank Top to Top of <br />P is " <br />Hi st Penetration: <br />a ! <br />Height from Tank Top to Lowest <br />�2 t <br />Z <br />Electrical Penetration: <br />Condition of sump prior to te$ting: <br />&r <br />(� r <br />Portion of Sump Tested' <br />OqJ er 2-q ' <br />Mr,46K44a 31 ° t <br />Does turbine shut down when <br />UN* U NA <br />sump sensor detects liquid (both <br />es U No U NA <br />U Yes U o U NA U Yes.�No NA. <br />roduct and water T <br />Turbine shutdown response time <br />7 sz G, <br />I <br />7 Seec—, <br />Is system programmed for fait safeI'es <br />U No U NA <br />shutdown?' <br />' t <br />Yes U No U NA <br />U Yes h NA U NA U Yes No U <br />Was Earl-sagfe verified to be <br />`Yes U Nfl U N/el <br />es U No U NA <br />U Yes IU No . U NA U Yes U No U <br />Wait time between applying <br />pressure/y=um/waer and starting <br />test: <br />?p <br />Test Start Time: <br />'Y : / 5 <br />Initial heading (RQ: <br />ry <br />Test End Time: <br />(5 <br />Final Reading (Rp): <br />f "C/n-, <br />rye 1-401CI& <br />Test Duratiba: <br />Change in heading (Rp,R )- <br />Pass/F$ii Thmsitold or Criteria:30 <br />10*1Was <br />sdnsot removed for testing? <br />No U NA <br />F <br />es U No U NA <br />Yes U No U U UNo UWas <br />sensorproperly replaced andNo <br />ver'if'ied functional 4f=testhn 1 <br />U NA <br />eq U'No U NA <br />U Yes U No U U es U Na U N <br />Comments — Cmcltfde tziformatton on repairs made prior to testing, mrd recommended bllofv-up�br ailed tents) <br />--- , <br />° If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested (See SWRCB LG -160) <br />