My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:10:00 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWR.CB, January 2002 Page 6 of <br />R_ FILL RI-QG'I? vnw rA numrwrr vv Tam D rr, v v-v&T*- <br />Comments — (include Infor»urtion on repairs made prier ro terrir and recommended �oz'low-up ior�uiled rests) <br />- s�,v <br />Facili is Not ' ed With Fill Riser Containment Sum s <br />Fill Rim Containment LiEw are Present, but were Not T ed <br />est Method Developed By: U Sump Manufacturer U Industry Standard U Professional Engineer <br />U Other (Spew) <br />Test M Used: U Pressure U Vacuum U Hydrostatic <br />U Esher (Specify) <br />Testen# Resolutio <br />ed: Equip�m,..- <br />Fill Sum # Fill Sum # Fill Sum Fill Sum # <br />Dianyle, <br />egrom Tank Top to Top of \ <br />Mghest Piping Penetration: <br />Lieight from Tank Top to Lowest <br />Electrical Penetretidn: <br />Condition of sump prior to <br />testing: <br />ortionof Sum Tested <br />ait timebetween, applyingessyse/vacuum/water <br />rN <br />and <br />artin test <br />Test Start Time: <br />Initial. Readin J : <br />Test End Time: <br />Proal Reading &2: <br />Test Duration: <br />t:haa M, R _l2 <br />Pass/Fail Threshold -OT <br />MW <br />there a ? U Yes U No <br />U Yes UTI© U Yes NQ Na I <br />U Yes U No <br />Does the sensor oTm when <br />either product water is U Yes U No U NA <br />U Yes U No U NA U Yes U No U <br />U Yes U No U NA <br />detected? <br />Was seas removed for testing? U Yes U No U NA <br />U Yes U No U NA '-UYes U No U NA <br />U No U NA <br />Was ensor properly replaced and U Yes U No U NA <br />verified fimetional aiier ter ' T <br />U Yes U Nd U NA U Yes U No U NA <br />U Yes U U NA <br />Comments — (include Infor»urtion on repairs made prier ro terrir and recommended �oz'low-up ior�uiled rests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.