My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:10:00 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. <br />Installed OPW 2100 Series ✓ or 5'00 Series vapor spill containment bucket onto <br />vapor riser and tightened to l so ft. lb. <br />Thread sealant compound used 1 6 [0. 1,0 S4tf <br />Assembled 61 SO-4000-EVR Series overfill prevention valve <br />Used OPW supplied epoxy Yes ✓ No <br />Applied epoxy: To upper 1" inside of top tube; under cinch head bolts and lock <br />washers; on threads of valve body at lowertube connection. <br />Yes ,i No <br />Allowed epoxy to cure for 24 hours before exposure to fuel or vapor <br />Yes No <br />Installed OPW 61 SO 40OC-EVR Series overfill prevention valve into fill spill <br />containment bucket. Yes _jZ No <br />r j <br />Installed OPW 61 JSK Jack Screw assembly on top of 61 SO 40OC-EVR Series overfill j <br />prevention valve. Yes No <br />Lock-Tite applied to screws Yes ✓ No <br />Screws tightened to /y ft. lb. <br />Installed faced off 4" NPT pipe nipple in fill spill containment bucket and tightened <br />nipple • t' ft. lb. <br />Thread sealant compound used <br />Tool used to install nippler,• - d r <br />Installed faced off 4" NPT pipe nipple in vapor spill containment bucket and tightened <br />nipple to /10 ft. lb. <br />Thread sealant compound used Nua noon <br />Tool used to install nipple oy c 2 IDv4u, ea- , 6 (JA <br />Installed OPW 61 SALP Fill swivel Adaptor onto faced off 4" NPT pipe nipple in fill <br />spill containment bucket and tightened fill adaptor to /i® ft. lb. <br />Thread sealant compound used 6 32284 a <br />Tool used to install nipple G L 5,4 -V-Go <br />Installed OPW 61 VSA Vapor Swivel Adaptor onto faced off 4" NPT pipe nipple in <br />vapor spill containment bucket and tightened vapor adaptor to jia ft. lb. <br />Thread sealant compound used 810-0 oja9tc <br />Tool used to install nipple G i 5A The ( <br />OPW 61 SA -Tool used to install OPW components Yes ✓ No <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.