My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:10:00 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
61SALP Rotatable Product Adaptor <br />INSTALLATION INSTRUCTIONS <br />(25 mm) <br />CK dG <br />41 <br />LL <br />...... .... <br />Stop I <br />The riser nipple in the spill container must be out square and deburred. See drawing note for the correct distance <br />between the top of the nipple and finished grade. (Optional: Use a OPW FSA -400 Face Seal Adapter with nipple. <br />Add 3-1/4" to distance from top of nipple to finish grade). <br />Stop 2 (Optional) <br />Apply pipe dope to the nipple. Pipe dope to be non -hardening, gasoline resistant pipe thread seal compound. <br />Stop 3 <br />Tighten the Rotatable Adaptor onto the nipple with a torque of 90 ft -lbs min. to 110 ft -lbs max this will be enough <br />torque to seat and seal the gasket. Use an OPW 61 SA -TOOL to install rotatable adaptor. <br />A <br />P.O. Box 405003 * Cincinnati, Ohio 45240-5003 <br />1400-422-2525 Domestically <br />513-870-3315 Internationally <br />www.opw-fc.com <br />Copyright, 2002 - OPW Fueling Components Inc., Cincinnati, OH <br />Printed in U.S.A. p1n H12712PA- 9/02 <br />OPW Fueling Components - Phase I Vapor Recovery System — VR -102-A <br />Product <br />1-2100 Series <br />Cap <br />See Spill Container w/ <br />Note Drain Valve <br />Below <br />Note: Use only a factory <br />made nipple. Nipple must be <br />cut square and deburred to <br />Note: Top of Nipple to Finish Grade for <br />provide a suitable sealing <br />OPW Rotatable Product Adaptor: <br />surface. (Optional: Use <br />61 SALP: 6-3/4" (172 mm) <br />OPW FSA -400 with nipple) <br />Stop I <br />The riser nipple in the spill container must be out square and deburred. See drawing note for the correct distance <br />between the top of the nipple and finished grade. (Optional: Use a OPW FSA -400 Face Seal Adapter with nipple. <br />Add 3-1/4" to distance from top of nipple to finish grade). <br />Stop 2 (Optional) <br />Apply pipe dope to the nipple. Pipe dope to be non -hardening, gasoline resistant pipe thread seal compound. <br />Stop 3 <br />Tighten the Rotatable Adaptor onto the nipple with a torque of 90 ft -lbs min. to 110 ft -lbs max this will be enough <br />torque to seat and seal the gasket. Use an OPW 61 SA -TOOL to install rotatable adaptor. <br />A <br />P.O. Box 405003 * Cincinnati, Ohio 45240-5003 <br />1400-422-2525 Domestically <br />513-870-3315 Internationally <br />www.opw-fc.com <br />Copyright, 2002 - OPW Fueling Components Inc., Cincinnati, OH <br />Printed in U.S.A. p1n H12712PA- 9/02 <br />OPW Fueling Components - Phase I Vapor Recovery System — VR -102-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.