Laserfiche WebLink
F. In -Tank Gauging / SIR Equl ent: <br />U-ieck this box if to *auging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />Yes <br />ONo* <br />For equipment start-up or annual equipment ce ' ication, was a leak simulated to verify LLD performance? <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />DYes <br />(3No* <br />Ef Yes <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />[El <br />ElNo* <br />❑ No* <br />Was accuracy of system product level readings tested? <br />3Yes <br />13 <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />13 <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section. H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />Vmmnlete the followinL7 checklist: <br />O Check this box if LLDs are not installed. <br />ET -Yes <br />❑ No* <br />For equipment start-up or annual equipment ce ' ication, was a leak simulated to verify LLD performance? <br />❑ N/A <br />1 <br />(Check all that apply) Simulated leak rate: 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />Ef Yes <br />1 ❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />' ❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />U Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />13 Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />' <br />N/A <br />or disconnected? <br />❑ Yes <br />O No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />N/A <br />malfunctions or fails a test? <br />O Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N/A <br />Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />I <br />Page 3 of 3 <br />03/oi <br />