Laserfiche WebLink
• <br />7. Evacuation Procedures <br />(1) In the event that the hazardous waste or materials incident threatens employees or other occupants of a DSS Company job <br />site, the EC in command shall order an immediate evacuation. <br />(2) The EC or designee will announce the evacuation via the public address/paging system or other communication system. <br />(Describe): <br />(3) Employees, upon hearing the order to evacuate, or who otherwise become aware of the need to evacuate, shall notify other <br />employees, safely cease operations and evacuate without delay via the nearest designated unobstructed exit. An evacuation <br />plan (see Section 8 below) is posted in all work areas showing the nearest exit(s) and the location of the assembly area in <br />front of the building. <br />(4) Regardless of the exit used, all employees who evacuate shall assemble at <br />The EC or designee shall be present in this location to account for all personnel known to be on the site. <br />leave the site without specific authorization by the senior supervisor, EC or designee. <br />No employee shall <br />(5) Employees shall not re-enter the job site for any purpose until specifically authorized to by the EC or designee. <br />8. Evacuation Routes <br />If evacuation is required, the following routes must be taken. If any evacuation route is blocked by the hazard, the secondary <br />routes shall be taken: <br />Location of Employee/Evacuee <br />Evacuation Route <br />Secondary Route <br />As required by CaVOSHA Standard, 8 CCR § 3220, evacuation routes are diagramed and posted in various locations at the <br />facility. <br />9. Approval and Adoption <br />Contingency Plan Approved by: <br />Title: <br />Signature/Date: <br />Effective Date: <br />Note: This Contingency Plan will be reviewed annually and revised as necessary. Recipients will be provided a revised copy if <br />significant changes are made. <br />