My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1995-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:13:14 PM
Creation date
6/23/2020 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2006
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1995-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.S WRCB,January 2002 Page l of <br /> 9. SPUJJOVERFELL CONT NT BOXES <br /> Facility is Not Equi ped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer Andustry Standard ❑Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: ❑Pressure ❑Vacuum Qydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# JG Spill Boz#Ijs,V Spill Boz Spill Boz#-7 (/ <br /> Bucket Diameter: 7i i yam?, <br /> Bucket Depth: /z" ®` /Z '` /Z '` <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: /�-r+►�^ - G� ~�- a- <br /> Test Start Time: <br /> Initial Reading(R): ®� j®. S.S`r •c 1�. �-- <br /> Test End Time: <br /> Final Reading(RF): fj ' ` /®� .S`! O ` /V, .S— <br /> Test Duration: Al / <br /> Change in Reading(RF-RI): Z'2 CID <br /> Pass/Fail Threshold or ��,�,� � ��✓ /, e <br /> Criteria: <br /> Teat Result Y,' P k' v a$3 'atl . Pass ❑Fail Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> D <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.