Laserfiche WebLink
i <br /> i <br /> TANKNOLOGY <br /> Stage II Vapor Recovery Test Results Form <br /> Air/Liquid Ratio Test For Vacuum Assist Systems <br /> Site Information: DALE ROAD 4120 DALE ROAD MODESTO CA.95356 <br /> Work Order#: 2236217 Date: 05/13/2005 Technician: RAYMOND SIMMS <br /> Product Flow Rate Calculation jAir Volume Metered(ft^3) Ambient Conditions Corrected Final <br /> Gallons(g) Time(s) Flowrate Initial Final Volume Pressure Temp. Air Volume Calculated A/L Ratio Results <br /> Nozzle# Product Dispensed Seconds G.P.M. Reading Reading Metered Inches Hg Degrees F (ft^3) A/L Average Pass/Fail <br /> 7.500 54.17 8.3 784.34 785.50 1.160 1.16 <br /> 11-800 REG 1.16 Pass <br /> 7.506 60.23 7.5 785.50 786.66 1.160 1.16 <br /> 11-800 PLUS 1.16 Pass <br /> 7.482 62.55 7.2 786.66 787.80 1.140 1.14 <br /> 11-800 SUPREME 1.14 Pass <br /> Type of System Tested: _____Healy Vac-Ass w <br />