My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1995-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:13:14 PM
Creation date
6/23/2020 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2006
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1995-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revision Date: November 6, 2001 <br />Tracer Research Corp. <br />Tracer Tight Line Test <br />LINE TIGHTNESS TEST METHOD <br />Certification: Leak rate of 0.1 gph with PD =100% and PFA = 0%. <br />Leak rate of 0.005 gph with PD = 97% and PFA = 2.9%. <br />Leak Threshold: A pipeline system should not be declared tight when tracer chemical is detected <br />outside of the pipeline. <br />Applicability: Gasoline, diesel, aviation fuel, fuel oil #4, waste oil. <br />Other fluids which are compatible and soluble with an acceptable tracer chemical <br />may be tested after consultation with the manufacturer. <br />Pipeline Capacity: Not limited by capacity. <br />Waiting Time: Ranges from 1 week to 4 weeks (normally 2 weeks) after tracer is added to tank. <br />For very large pipeline systems, several days or weeks may be required to circulate <br />tracer -labeled product through all parts of the pipeline. <br />Waiting time begins after tracer has reached all portions of the pipeline being <br />tested. <br />Tracer Dosage: Dosage of tracer is based on tank size, product volume in tank, and frequency and <br />volume of tank refills according to manufacturer's recommendations. <br />Tracer -labeled product must be circulated through the pipeline before test period <br />begins. <br />Pressurized pipeline must be brought up to operating pressure or operated on a <br />daily basis. <br />Permeability: Soil permeability must readily allow tracer movement through the tank excavation <br />backfill (greater than 1 Darcy). <br />Probe: Radius of influence of each tracer sampling probe is maximum 10 feet. <br />Pipeline must be accurately located to ensure that all pipeline surfaces are within <br />the zone of influence of a sampling probe. <br />Probes must be installed per Manufacturer's guidelines. <br />Comments: Frozen and saturated soil surrounding pipeline may limit effectiveness of this test <br />method. <br />Groundwater surrounding pipeline may limit effectiveness of test method (e.g. <br />when applied to pipelines containing water -miscible products or products whose <br />specific gravity is greater than 1). <br />Tracer Research Corp. <br />3755 N. Business Center Dr. <br />Tucson, AZ 85705 <br />Tel: (800) 394-9929 <br />Evaluator: Ken Wilcox Associates <br />Tel: (816) 443-2494 <br />Date of Evaluation: 10/04/91 <br />Evaluator: Control Strategies Engineering <br />Tel: (602) 682-8726 <br />Date of Evaluation: 05/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.