My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1995-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:13:14 PM
Creation date
6/23/2020 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2006
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1995-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UL/ULC Listed RED WREADO 11A Piping <br />ummmol <br />'` • r <br />SCOPE <br />PIPE - Pipe shall be manufactured by Smith Fibercast by <br />a filament winding process using a thermosetting epoxy <br />resin to impregnate strands of continuous glass filaments <br />which are wound around a mandrel at a prescribed helix <br />angle and under controlled tension. All pipe will be <br />supplied with matching tapered T.A.B TM (Threaded and <br />Bonded) coupling and spigot ends or T.A.B. spigot x <br />spigot ends. <br />CONSTRUCTION <br />2"-4" PIPE - RED THREAD IIA pipe shall have continuous <br />glass fibers filament wound at a 35%` helix angle in a <br />matrix of epoxy resin. Pipe shall be in compliance with <br />ASTM D2310 and classified by its designation code. Pipe <br />shall meet all dimensional and performance <br />requirements, mechanical properties, and shall be <br />classified with the following designation codes: <br />Size Designation Code at 73.4° F <br />2"-3" RTRP-11 AE <br />4" RTRP-11AF <br />ITEMS <br />' 2"-4" PIPE - Glass fiber reinforced filament wound pipe <br />with matching tapered T.A.B. (Threaded and Bonded) <br />coupling and spigot ends. Pipe to be factory prooftested <br />at the following pressures: <br />2" - 375 psig <br />3" - 300 prig <br />4" - 265 psig <br />2"=4" FITTINGS - Compression molded fittings shall be <br />manufactured using an epoxy molding compound. The <br />molding compound shall be reinforced with a minimum <br />of 45% chopped glass fiber. In-line fittings are filament <br />wound. <br />ADHESIVES - Adhesive and curing agents shall be either <br />UL Listed DS -8000 or DS -7000 series adhesive. <br />Consult Smith Fibercast's installation manual No. B2160 <br />for recommended heat curing techniques. <br />JOINING TECHNIQUES <br />2"-4" PIPE and FITTINGS - Pipe and fittings shall be <br />joined with DS -8000 or DS -7000 series adhesive using <br />matching tapered bell/coupling and spigot. Material to <br />be installed in accordance with Smith Fibercast's <br />installation manual No. B2160. <br />TESTING <br />2"-4" PRIMARY PIPE SYSTEMS - Primary pipe systems <br />should be tested prior to use to assure soundness of all <br />joints and connections. Consult Smith Fibercast's <br />_} installation manual No. B2160. <br />• • •ona 111111111 Ira• • <br />SCOPE <br />PIPE - Pipe shall be manufactured by Smith Fibercast by <br />a filament winding process using a thermosetting epoxy <br />resin to impregnate strands of continuous glass filaments <br />which are wound around a mandrel at a prescribed helix <br />angle and under controlled tension. <br />CONSTRUCTION <br />3"-4" PIPE - RED THREAD IIA pipe shall have continuous <br />glass fibers filament wound at a 35%* helix angle in a <br />matrix of epoxy resin. Pipe shall be in compliance with <br />ASTM D2310 and classified by its designation code. Pipe <br />shall meet all performance requirements and mechanical <br />properties, and shall be classified with the following <br />designation codes: <br />Size Designation Code at 73.4 <br />3" RTRP-11 AE <br />4" RTRP-11 AF <br />ITEMS <br />3"-4" PIPE - Glass fiber reinforced filament wound pipe <br />with Plain end by Plain end. Pipe to be factory <br />prooftested at the following pressures: <br />3" - 300 psig (minimum) <br />4" - 265 prig (minimum) <br />3"-4" FITTINGS - Compression molded two-piece fittings <br />shall be manufactured using a vinyl ester molding <br />compound. The molding compound shall be reinforced <br />with a minimum of 60% chopped glass fiber. <br />ADHESIVES - Adhesive and curing agents shall be either <br />UL Listed DS -8000 or DS -7000 series adhesive. Consult <br />Smith Fibercast's installation manual No. B2160 for <br />recommended heat curing techniques. <br />JOINING TECHNIQUES <br />3"-4" PIPE and FITTINGS - Pipe shall be joined with <br />either DS -8000 or DS -7000 series adhesive. Fittings shall <br />be joined with either DS -7000 or DS -8000 series <br />adhesives and filler. Material to be installed in <br />accordance with Smith Fibercast's installation manual <br />No. B2160. <br />TESTING <br />3"-4" SECONDARY CONTAINMENT PIPE SYSTEMS - <br />Secondary containment pipe systems should be tested <br />prior to use to assure soundness of all joints and <br />connections. Consult Smith Fibercast's installation <br />manual No. B2160. <br />
The URL can be used to link to this page
Your browser does not support the video tag.