My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1995-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:13:14 PM
Creation date
6/23/2020 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2006
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1995-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alpha <br />Petroleum' <br />Services, Inc. <br />General Engineering A Hazardous C61/D64 C10 No 742466 <br />Maintenance—Construction—Electrical Contractor <br />ADDITIONAL SCOPE OF WORK <br />For <br />USA Gasoline #835, 2705 Country Club Blvd, Stockton, CA <br />Since we have to expose the fill and vapor risers to the top of the UST's we felt it would be practical to <br />install sumps and Phil-Tite manholes and EVR Buckets to meet the upcoming state EVR regulations for <br />2005. So we are asking to include within our permit the following Scope of Work: <br />• Once we are down to tank top we will remove the existing risers for the fill and vapor buckets. <br />• The existing Bung holes measures 24" in-between the fill and vapor risers. <br />• We will install a Western Fiberglass Sump with a bottom to using tank bung adaptors as per "Cut <br />Sheet 1 ". <br />• We then install a Phil-Tite type offset to make up the difference between being 24" centers from fill <br />and vapor bung holes to the Phil-Tite 16" SC -3600 -TSC -2-1 Man -way lids. Off sets "Cut Sheet 2 <br />and 3", Phil-Tite lids "Cut Sheet 10" <br />• The Extractor Vent Valve we will be installing is a ERW and is shown in "Cut Sheet 4" <br />• We will install 4" risers steel riser pipes for the fill and vapor in one length, not with a coupler <br />• We will install conduit penetrations and run conduit to install sump sensors <br />• The Torque Tool Adapter we will be using is shown in "Cut Sheet 5" <br />• We will use Phil -T SC -3600 -TSC -2-1 Type fill and vapor buckets as per attached "Cut Sheet 6" <br />We will backfill sumps with pea gravel <br />• The drop tubes will be OPW 61 T shown in "Cut Sheet 7" <br />• Once all penetrations are complete and Risers installed we will test sump for tightness. <br />• We will use Western Fiberglass Type B Reducer Lids as per "Cut Sheet 8" <br />• For our Watertite Sump Shield we will us the Phil-Tite Type FG-3433-WTSS as per "Cut Sheet 9" <br />• Then our Manhole cover will be Phil-Tite SC -3600 -TSC -2-1 as per "Cut Sheet 10" <br />• When complete we will call for inspection before we pour concrete <br />• Once we have inspection we will place re -bar and pour and finish concrete <br />Page 1 of 2 <br />M 1 11 N - <br />WHERE OLD FASHIONED SERVICE MEETS MODERN TECHNOLOGY! ! ! r PEI <br />.,��«,1 <br />P.O. Box 667 (707) 678-8100 <br />Dixon. CA 95620 Toll Free (888)462-2961 (707) 678-8111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.