My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1995-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:13:14 PM
Creation date
6/23/2020 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2006
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1995-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , NEW UST INSTALLATION INSPECTION RECORD <br />FACILITY NAME:�' �t f ADDRESS: Q <br />SWEEPS9 -Z, !® 7Z- TANKS l uurfO TANK TERIAL: J 5 , <br />CAPACITY: /_ �}7jz� PRODUCT: n R.E.H.S: <br />INITIAL INSPECTIONS <br />A <br />I <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: W SOAP: PSI: HRS/MIN: 3C) BRIME(LIQUID ): OTHER: <br />P <br />M <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />/_ 3 f6 <br />P <br />I <br />WITH MAWFAC7UR8t WRITTEN SPECIFICATIONS <br />U <br />R <br />0 <br />T <br />I <br />9.UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />�� <br />V <br />A <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br />6 <br />E <br />L <br />ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br />�� j 6 <br />D <br />S <br />16. <br />BALL FLOAT VALVES INSTALLED <br />(CCR 2635 (B) (6)) <br />�� �.- 6 <br />--rr <br />M <br />17. <br />OVERFILL PROTECTION INSTALLED/ <br />ITEM OR EQUIPMENT I U"� <br />DATE <br />✓ <br />18. <br />7Aj s- <br />(CCR 2631 (D) (5)) <br />4 <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />/®_Z6.ti <br />19. <br />TAD( INTEGRITY TEST (PASSING HARD COPY) <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />INITIAL INSPECTIONS <br />PIPING INSPECTIONS <br />�! <br />(7 <br />✓ <br />r( <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: W SOAP: PSI: HRS/MIN: 3C) BRIME(LIQUID ): OTHER: <br />X23 �G <br />M <br />4. PRIMARY TANK TEST: PSI: 8RS/MIN:,3c) <br />/_ 3 f6 <br />1/ <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />PIPING INSPECTIONS <br />�! <br />(7 <br />✓ <br />t4 <br />6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) Sl� OPS �h,f, (CCR 2635 (B) (4)) <br />��� <br />✓ <br />M <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: , W"N /MIN: b (7 OTHER.- CCCR 2635 (A) (4)) <br />_ <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (A)) <br />U <br />lqt.14. <br />9.UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />�� <br />✓ <br />10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br />6 <br />/1,14111. <br />PERFORMANCE TEST OF AUTOMATIC PUP SYSTEM SMUT -OFF <br />ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br />FINAL ;NSPECTION <br />G <br />✓ <br />t4 <br />12. <br />PERFORMANCE TEST FOR -ALL- MONITORINGPROBES(CCR <br />2632 (C) (2)) <br />U <br />✓ev13. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />U <br />lqt.14. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR 2632 (D) 2635 (B) (5)) <br />15. <br />PERFORMANCE TEST OF AUTOMATIC PUP SYSTEM SMUT -OFF <br />(CCR 2635 (B) (5)) <br />�� j 6 <br />✓ <br />16. <br />BALL FLOAT VALVES INSTALLED <br />(CCR 2635 (B) (6)) <br />�� �.- 6 <br />✓ <br />M <br />17. <br />OVERFILL PROTECTION INSTALLED/ <br />(CCR 2635 (E) (2)) <br />,;-zj-f 6 <br />✓ <br />18. <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) <br />(CCR 2631 (D) (5)) <br />4 <br />,� <br />tj <br />19. <br />TAD( INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (A) (5)) <br />2- d b <br />✓ <br />M <br />20. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CCR 2632 (E) Cl) (2)) <br />, <br />✓ <br />JrW21. <br />-C" FORM COMPLETED AND SUBMITTED <br />(CCR 2635 (E)) <br />�-� 6 <br />22. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APP0VED <br />CCCR 2641-2644) <br />-S--2--$6 <br />✓ <br />ALL CONDITIONS MET; FACILITY PERMIT I <br />(H+S CODE 25284 (E) (F)) <br />EH23-006 3/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.