My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1995-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:13:14 PM
Creation date
6/23/2020 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2006
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1995-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION <br />JIM <br />I <br />ATERIAL:T1W-10 <br />R.E.H.S: <br />INITIAL INSPECTIONS <br />A <br />P <br />I <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCEr <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) Z Pj/ kr. <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />R <br />T <br />(CCR 2635 (A) (4)) <br />3 <br />O <br />I <br />S. <br />LACE TEST ON ALL SUPS (24 HR. MINIMUM) NRS: <br />V <br />A <br />V1 <br />Vj4 <br />E <br />L <br />(CCR 2635) <br />(CCR 2635 (B) (6)) <br />D <br />S <br />10. <br />OVERSPILL PERFORMANCE TEST <br />(CCR 2635 (A) (4)) <br />j ys,r/6 <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />11. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR 2635 (B)) <br />19_ <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />UST PLANS SUBMITTED/ FEES PAID (H+"S CODE 25287, CCR 2635 (D) (8) <br />o <br />t,4 20_ <br />2_ UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />INITIAL INSPECTIONS <br />PIPING INSPECTIONS <br />V1 <br />3- INSPECTION AND TEST OF SECONDARY CONTAI HOLIDAY: <br />VACUUM: ?Z,y SOAP: PSI: NRS/MIN: BRINE(LIQUID ): OTHER: <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) Z Pj/ kr. <br />(CCR 2635 (B) (4)) <br />4. PRIMARY TANK TEST: PSI: Jr NRS/MIN: -3® <br />13. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />5. TANK APPROPRIATELY PLACED WITH BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />3" ;6 <br />V1 <br />tild12. <br />6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) Z Pj/ kr. <br />(CCR 2635 (B) (4)) <br />✓ <br />13. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />7. <br />SECONDARY PIPING CONTAINMENT TEST PSI: .7 HRS/MIN: �,a ® OTHER: <br />(CCR 2635 (A) (4)) <br />3 <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR 2632 (D) 2635 (B) (5)) <br />S. <br />LACE TEST ON ALL SUPS (24 HR. MINIMUM) NRS: <br />(CCR 2635 (A)) <br />/_2.5--76 <br />V1 <br />Vj4 <br />9. <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />(CCR 2635) <br />(CCR 2635 (B) (6)) <br />10. <br />OVERSPILL PERFORMANCE TEST <br />(CCR 2635 (A) (4)) <br />j ys,r/6 <br />✓ <br />a <br />11. <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR 2635 (B)) <br />FINAL INSPECTION <br />3" ;6 <br />tild12. <br />PERFORMANCE TEST FOR -ALL- MONITORING PROBES <br />(CCR 2632 (C) (2)) <br />-.e)4 <br />✓ <br />13. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />44-.1 <br />14. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR 2632 (D) 2635 (B) (5)) <br />15. <br />PERFORMANCE TEST OF AUTOMATIC PIUMP SYST84 SHUT-OFF <br />(CXR 2635 (B) (5)) <br />_ <br />f <br />16. <br />BALL FLOAT VALVES INSTALLED <br />(CCR 2635 (B) (6)) <br />17. <br />OVERFILL PROTECTION INSTALLED/ <br />(CCR 2635 (E) (2)) <br />18. <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCOED AND WATERTIGHT) <br />(CCR 2631 (D) (5)) <br />19_ <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 CA) (5)) <br />t,4 20_ <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CXR 2632 (E) (1) (2)) <br />-C- FORM mNpLETED AND SUBMITTED <br />(CCR 2635 (E)) <br />,-� <br />✓ <br />22. <br />MONITORING METHOD FOR ALL TADCS AND PIPING APPROVED <br />(CCR 2641-2644) <br />23. <br />ALL CONDITIONS NET; FACILITY PERMIT ISSUED <br />(N+"S CODE 25284 (E) (F)) <br />coMrNrs 6 �. z6 E,6 <br />pic <br />EH23-006 3/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.