Laserfiche WebLink
STATE OF CALIFORNIA "F ...... <br /> STATE WATER RESOURCES CONTROL BOARD ; <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION-FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSE ONSITE <br /> ONE ITEM 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK L D.• 1001 B. MANUFACTURED BY: "7_;GJU$C�o <br /> C. DATE INSTALLED(MO/DAY/YEAR) D. TANK CAPACITY IN GALLONS: 1 ®O <br /> ILTANKCONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> A X 1 MOTOR VEHICLE FUEL ❑ 4 OILB. C. 1n REGULAR <br /> 3 DIESEL ❑ 6 AVIATION GAS <br /> F__] 2 PETROLEUM F7 80 EMPTY 1 PRODUCT ❑ lb PREMIUM <br /> UNLEADED PI 4 GASAHOL O 7 METHANOL <br /> O 3 CHEMICAL PRODUCT O 95 UNKNOWN a 2 2 WASTE LEADED ❑ 99 JOTHER ET L(DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.s: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF 1 DOUBLE WALL El3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK <br /> F—] 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ( 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING O 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR)1�iy S OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR)Act G S <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A 2 RESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A(Q2DDOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A 4D4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING Ln <br /> 3 MONERSTITLAL <br /> RORING ❑ <br /> 99 OTHER <br /> V.TANK LEAK DETECTION <br /> 1 VISUAL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING LZx 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> 6 TANK TESTING 4 7 INTERSTITIAL MONITORING ❑ 91 NONE O 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES NO <br /> SUBSTANCE ❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENAL OF PE Y,A TO H ST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAMEDATE <br /> (PRINTED a SIGNATURE) L <br /> � ,�a slur <br /> r <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BEL <br /> COUNTY# JURISDICTION# FACILITY# TANK#006-STATE LD.# 3 1 / lo 0T I EO <br /> PERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORMA,UNLESS A CURRENT FORMA HAS BEEN FILED. <br /> FILE THIS FORM WITH OCAL AGENCY IMPLEMENTING THE UNDERGROUND ST E TANK REGULATIONS <br /> FORM B (12.91) � � FflR00Jtg. <br />