Laserfiche WebLink
SAN JOA dW COUNTY ENVIRONMENTAL HEALTH BWARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 M01.1 <br /> TYPE OFACTION FLNEW PLAN ❑ 2 CHANGE OF INFORMATION <br /> PLAN TYPE .MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. moz <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEMS): <br /> I. FACILITY MFOPMAUON <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME �_ASq (::..a <br /> FACILITY SITE ADDRESS Q-705 M03. <br /> M04- CITY M05- <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06 <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED id 1.ANNUALLY 0 99.OTHER(Specify): MOT <br /> H1. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TAW MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: C7r a.DRY ❑ b.LIQUIDFILLED 0 c,UNDER PRESSURE r_1 A ---""-UUM M11- <br /> PANEL MANUFACTURER: 1 explRoDM12 MODEL#: -77-S 35Z M13. <br /> LEAK SENSOR MANUFACTURER: U der R.o I m14- MODEL#(S): 79q59 ti-V,)-J M15. <br /> ❑ 2 AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: M18- MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: 0 a.CONTINUOUS ❑ b.DAILY/NIGHTLY WEEKLY M20. <br /> [] d.MONTHLY ❑ Q OTHER(Specify): M21. <br /> PROGRAMMED TESTS: [I a.0.1 g.ph. ❑ b.0.2 gp.h. ❑ c.OTHER(Specify): M22 M23. <br /> 0 3.INVENTORY RECONCILIATION rl a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: n a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: [] a.ANNUALLY 0 b.BIENNIALLY [3 c,OTHER(Specify): M26. M27. <br /> 0 &VISUAL MONITORING DONE: El &DAILY [I b.WEEKLY Mww army wp.9) <br /> 0 99.OTHER(Specify): M2& <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)(TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: 01-DRY [IID LIQUID FILLED ❑ c,UNDER PRESSURE [I d.UNDER VACUUM <br /> PANEL MANUFACTURER: U QeC-A& 11,,tJ m2- MODEL#: -rL S 350 M33. <br /> LEAKSENSOR MANUFACTURER: i jae.6at RQzJ M34- MODEL#(S): -7,�q3yz -ac)? M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(Le,TURBINE)SHUTDOWN? A a.YES ❑ b.NO M36 <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC FAR SHUTDOWN9 jq a.YES ❑ b No M37 <br /> 2.MECHANICAL LINE LEAK DETECTOR (NILM) THAT ROUTINELY PERFORMS 3.0 g.ph. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED k2A <br /> MLLD MANUFACTURER(s): M38 MODEL#(S): ✓ M39.IQ SS EeA <br /> ri 3.ELECTRONIC LINE LEAK DETECTOR(FLED)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER M40. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: [1a.MINIMUM MONTBLY0.2g.p.h. [I b.MINIMUM ANNUAL 0.1 gp.h. M42, <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILLELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44- <br /> El 4.INTEGRITY TESTING <br /> TEST FREQUENCY: n a.ANNUALLY ❑ b.EVERY 3 YEARS 0 c.OTHER(Specify) M45. M46. <br /> ❑ 5.VISUAL MONITORING DONE: n a.DAILY 0 b.WEEKLY* [] c.MN MONTHLY&EACH TIME SYSTEM OPERATED- M47 <br /> *Req--W-cy approval "Allowed form ofunbuned emagatcy Sawrator ffid pWmg oidy pw MC§M281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7 NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> _E1 99.OTHER(Specify) M48. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />